My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1257
>
2300 - Underground Storage Tank Program
>
PR0231463
>
INSTALL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:06:28 PM
Creation date
11/7/2018 1:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0231463
PE
2361
FACILITY_ID
FA0003707
FACILITY_NAME
AHMEDS SONS INC
STREET_NUMBER
1257
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20015015
CURRENT_STATUS
01
SITE_LOCATION
1257 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\Y\YOSEMITE\1257\PR0231463\1991 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND TANK INSPECTION RECORD <br /> NEN TANK INSTALLATION <br /> SITE NAME INSPECTOR'S NAME <br /> ADDRESS /a Vo—`e,,0, /,/F CITY 21P <br /> CONTRACTOR: NAME >.�i Pi' ✓ ZG� PHONE <br /> OWNER: NAME (.<)P4'/Or PHONE <br /> DIS INSPECTOR'S <br /> TPPROVID PPROVED INITIALS <br /> jITEM OR EOUIPMENT INSPECTED <br /> (,U LFed <br /> L L' proved <br /> INITIAL INSPECTION <br /> r I/ t✓t-' UL numbers i `1 -N tank size <br /> t_ - Tank tested upon delivery (Holiday (plasteel) or air at 5 PSI (FRP)) <br /> �.L� Visual inspection of secondary contai ment. <br /> J (,� Tank appropriately placed with approved backfill. <br /> (PING STAGE INSPECTION <br /> 1. Pressure test of piping. [Primary and Secondary (NFPA 30)) <br /> 2. Ball float valves installed. <br /> 3. Overfill protection installed, describe: <br /> 4. Unused tank opening seated and cathodically protected. <br /> , <br /> �/ CJ 5. Visual inspection of secondary containment on piping. <br /> 6. Monitoring ports in place and brought to grade. (lockable weather proof covers) <br /> / `q ✓ 7. Fill and vent piping brought to grade. <br /> rj GJ 8. Product fine leak detector in place. (Hard wired) i <br /> y J 9. Approved tank leak monitoring device installed. , <br /> Lob 10. All galvanized piping and fittings properly wrapped. <br /> 1. Pressure decay test on complete tank and product delivery system. <br /> INAL INSPECTION <br /> �Jb� / 1. Precision test successfully completed and hard copies received. (NFPA 329) <br /> L" 2. Spill protection at fill pipe. <br /> 6/�f/ i 3. Performance test of overfill protection system. <br /> g� w C 4. Performance test of product line teak detector. (Hard wired) <br /> KI <br /> - '*A � GO5. Performance test of continuous monitoring system(s) on tank (s) <br /> :y/�/ u �p 6. Permit to operate application complete. <br /> �C ) 7. Acceptable recordkeeping system. <br /> Comments: <br /> EH 23 006 70�gq <br />
The URL can be used to link to this page
Your browser does not support the video tag.