Laserfiche WebLink
KNOLOG .. VacuTect"m TEST REPORT <br /> S.O. # 164947 <br /> TECNNOI.OGY FGR TANKS <br /> AND THEM ENYIFiONYENT <br /> Date 03/25/96 <br /> Owner A B F FREIGHT SYSTEM, INC Site # STK-156 <br /> Phone <209> 823-2151 <br /> Invoice Name/Address A B F FREIGHT SYSTEM, INC 2704 MARKET STREET ASTON , PA 19014 <br /> Attn: DON BOCK <br /> Site Name/Address A B F FREIGHT SYSTEM, INC 2427 W YOSEMITE MANTECA, CA 95336 <br /> TANKS LINES Leak Det <br /> Ullage TANKS and LINES Tested to CFR-40 Parts <br /> See Tank Dipped Dipped Probe Water Bubble Air Line Final Exist 280.281 &NFPA 329 Specs. <br /> DFia,,rrg• Dia.& Water Product Water Ingress Ingress Ingress TANK Line Delivery LINE LINE Leak LINE LD(s) NEW <br /> Material Levet Level Level Detected Detected Detected ■ Material Syst.Type TEST TEST Rate ■ Pass/ LD(s) <br /> ST/ ■ ■ ■ ■ ■ ■ Tight ■ ■ ■ ■ ■ Tight Fail/ Tested Other: <br /> FRP/ START START START or ST/ START END or or & <br /> Tank Tank Tank Lined END END END Yes/No Yes/No Yes/No Fail Line# FRP PS/SS/GS TIME TIME GPH Fail NONE PASS <br /> Product Capacity <br /> 1 DIE 10000 Diameter 00 . 000 050 . 00 00 00d N N N T lA ST SS 16 : 00 16 : 40 0 . 000 T - - E>-ILDSLMDLIMFG: <br /> New12nd LD SNIMD LIMFG: <br /> 9500 . 000 1050 . 00 00 00 <br /> Material Percent o Fill at Pump LINE TESD PSI 15 . 00 <br /> Start lime: 15 : 40 Time of Test: 53 . 0 Mig.: <br /> lank. be InClinemeter Dispenses Shear Valves <br /> ISTEnd Tim Test PSI:— EM Degrees: _ Ope+ate r es/nal <br /> E Rrst LD SNIMDLIMFG' <br /> Diameter <br /> Newi2nd LO SNIMDLlM+FG: <br /> 71aierlai Percent of Fill at Hump LINE TEST PSI <br /> Start Time: Time of Test: Mfq.. <br /> P+spencer Shear Valves <br /> Tank Pabe InclinomeleI operate"Sffiol <br /> Diameter <br /> End Time: Test PSE: Entr : Decrees: <br /> Ex+sl Ln$N/MDLlMF G: <br /> 4 Newl2nd LD SNIMDL/MFG: <br /> aterial Pump LINE TEST PSI <br /> Start Time: Time of Test: Mfg.: <br /> an be Inclinometer O :ate te D+spenser shear v— <br /> iameter End Time: Test PSP. Ent : Decrees: M <br /> Lr <br /> E-1.LU SN/MDMFG. <br /> New12nd LD SNNDQMFG: <br /> aterial Percent of Fill at ump LINE TEST PSI --_ <br /> Start Time: Time of Test: Mfg: Dispenser Shear valves <br /> lank. robe Incllnameler Operate t es/not <br /> End Time: Test PSL Enlr : De rees: <br /> E—t LO SN/ADL/MFG <br /> iameter <br /> New12nd LD SNIMDLIMPG: <br /> Material ercent ot Fill at Pump UNE TEST PSI. <br /> Stan Time: Time of Test: Mfg.: D+spenser Shear valves <br /> 'nk roe inclinometer Oaerale lveslno <br /> End Time: Test PSI: Enlr Decrees, <br /> E'-1 LD SNIMDL/rAFG. <br /> Diameter <br /> Newi2nd LD SN/MDLlMFG: <br /> —Paterial Percent of F Ill al ump LINE TEST PSI: <br /> Start Time: Time of Test: M1g.: Drspenser Shear valves <br /> lank, robe Inchnomeler o enter smog <br /> End Time: _ _ Test PSI: Ent t)e r s: <br /> Tanknology Corporation International <br /> TANKNOLOGY Region: WESTERN REGION Unit # 018 State LiC. # 1455 State: CA 5225 Hollister St., Houston, TX 77040 <br /> NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. (800) 888-8563 * FAX (713) 690-2255 <br /> TAK-0 t <br />