My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2427
>
2300 - Underground Storage Tank Program
>
PR0231501
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 4:03:35 PM
Creation date
11/7/2018 1:09:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231501
PE
2381
FACILITY_ID
FA0003495
FACILITY_NAME
ABF FREIGHT SYSTEMS INC
STREET_NUMBER
2427
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19817006
CURRENT_STATUS
02
SITE_LOCATION
2427 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\IAError\Y\YOSEMITE\2427\PR0231501\COMPLIANCE INFO 1986-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANKNCLOGY CORPORATION INTERNATIONAL � <br /> STANDARD TERMS AND CONDITIONS <br /> 1. scope of work. Tunknoiogy Corporation International ("Tanknology") agrees to test the underground product taok(s) specified on the <br /> reverse side of this Agreement,and associated piping to the extent feasible,for teaks(the"test").Customer agrees to pay for these services <br /> at the price(s)specified on the reverse side of this Agreement.Tanknology will perform the test in.a professional and-workmanlike fashion,us <br /> ing its VacuTectTM crocess,which exceeds the National Fire Protection Association's Pamphlet 929 0.05 gallon per hour Precision criterion. t <br /> The VacuTect process does nct require storage tanks to be tiled but optimum results are obtained with tanks 60% to 9()% full, it shaEl be <br /> are filled within this range at least four(4)hours prior to the commencement of the <br /> Customer's responsibility to insure that the storage tank(s) <br /> test. <br /> 2.Report.Tanks will be tested to the specification designated by the Customer as shown an the reverse side of this agreement.Following <br /> the tests, a written report indicating compliance or non-compliance and other pertinent information relating to the tank's condition will be <br /> issued to the Customer. No reports or other information concerning the tank's condition shall be given to anyone other than the Customer <br /> unless so requested by the Customer or required by law. <br /> 3.Payment.All amounts payable hereunder are due thirty(30)days from the date of invoice.A finance charge will be imposed at an annual <br /> percentage rate equal to the lower of(i)18% or(ii)the highest interest rate allowed by applicable law,and will accrue from the due date until <br /> paid.Customer agrees to pay, In addition to the service charges shown on the reverse,all sales taxes, use taxes,and any other fees or taxes <br /> levied by state or municipality upon services or goods supplied by Tanknology (except taxes based upon net income to Tanknology). <br /> Customer shall reimburse Tanknology for all reasonable expenses and legal fees incurred in collecting payment.All payments shall be made <br /> at (Address) <br /> Tanknology Corporation International in <br /> (City) <br /> Houston (County) Harris (state) Texas <br /> Except as otherwise specified,Tanknology will provide all test equipment and labor necessary to perform the test,The price specified an <br /> the reverse side of this Agreement covers only the performance of the test specified on the reverse side of this Agreement, which includes a <br /> maximum of two(2)hours of travel and service time by Tanknology's employees.The price deer not include additional services or goods such <br /> 99?�-069(EGL) :xe3 . NNyl-069(ElL) • tr6Z9-0V01L Xi'uotsnoH a 19}s110H geug <br /> IVN0IiVNH31N1 N011Vb0dd00 A0O-10N}INV1 <br /> :a}8q <br /> �7 <br /> GAireluasaided aaworsno 0PDjogov <br /> :aleQ rJ. :ainjeu61 <br /> jeworsno <br /> :alnleubiS ,,,�' FY'.,f :10A <br /> :allil :911!1 <br /> :aweN <br /> t r� r ri *t# � :awEN <br /> NOISIA10 3O1AH ]S A90-10NNNV1 :A8 031d3O0V <br /> 4uatuaal6V sigl 10 apis aS1aAa1 aql uo suoillpuoa pue, swam aql at 9816E pue <br /> ptielslapun `peal aAeq nolo 96pe[mouNoe noA `luawaal6V slgl 6ulubls AS 1Uewaal6V slgl jo tied se papnloul ale <br /> 14oti4m pue, aoualaIal Aq Malar{ palelodloow ale goluM `apis as1aA@1 aul uo suo!1!pu00 puE sullal plepuElS aaS <br /> -lsal to ll-els of soild slnoq (tr) Jnol }seal le Ilnl %06 01 %09 uaamlaq upewa1 lsnw s�uel <br /> ONSGAsIE01 amen 10 6uwdid 1otdols 01 .S <br />
The URL can be used to link to this page
Your browser does not support the video tag.