Laserfiche WebLink
RECEIVED <br /> MAR 2Agg016 of <br /> SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑MAVIKOLFF lORAENT <br /> ❑other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑other(Specify) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 100' Approx. 110' Approx.50' <br /> Product Stored: Regular 87 Regular 87 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Piping Sump#3 <br /> Wait time between applying 15 Minutes 15 Minutes 15 Minutes <br /> pressure and startin test: <br /> Test Start Time: 8:30 8:35 8:45 <br /> Initial Reading(Ri): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 9:30 9:35 9:45 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi 5 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br />