Laserfiche WebLink
i <br /> SWRCB,January 2002 Page_of_ <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps See Comments Below! <br /> Fill Riser Containment Sumps are Present,but were Not Tested <br /> Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br /> . Other(Specify) <br /> Test Method Used: i Pressure Vacuum ,-Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Fill Sump# Fill Sump# Fill Sump# Fill Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> test <br /> i <br /> n <br /> Portion of Sump Tested <br /> Sum Matal: <br /> Wait timeeribetween applying <br /> water and starting test: <br /> Test Start Time: <br /> Initial Reading(R1): <br /> Test End Time: <br /> Final Reading(R,): <br /> Test Duration: <br /> Change in Reading Rr.-Ri): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result. ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass 0 Fail ❑ Pass ❑Fail <br /> Is there a sensor in the sump? Yes No Yes No Yes No Yes _. No <br /> Does the sensor alarm when <br /> either product or water is Yes No NA Yes No NA Yes No NA Yes -No NA <br /> detected? <br /> Was sensor removed for testing? Yes -No No �NA Yes No _NA Yes -No NA Yes No NA <br /> Was sensor properly replaced and Yes No NA Yes No NA Yes No . NA Yes No NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Site has combination Fill Riser Containment Sump and Standard Turbin Pump Piping Sump. <br /> Test Data recorded on Piping Sump Page 4,of this Report. <br /> M •' <br /> A - <br /> N=- <br />