Laserfiche WebLink
Facility Employee Training Pa e 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. X <br /> All facility employees hired within the past 30 days have received the required on thejob training. X <br /> Monthly Inspection— <br /> Y <br /> ns ection— <br /> Y N NA Daze Done <br /> Monitoring system certification(within past 12 months) X 10-9-17 <br /> Spill Bucket testing completed(within past 12 months) X 10-9-17 <br /> Leak Detector-mechanical/electronic for most sites(within past 12 months) x 10-9-17 <br /> The shove are usually done together on on annual basis for local regulator. <br /> Line Tightness(usually upon construction or when no positive shutdown) $ <br /> Tank Tightness(Usually only after construction or when using SIR) $ <br /> Secondary containment(SB989)tests have been completed(usually every 3 yeas) g 10-14-15& <br /> 2-24-16 <br /> Other testing or maintenance completed as required List them below: <br /> Test/Maimenance: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> PRINTOUT INCLUDED: Yes® No ElNA❑BINDER DP TO DV <br /> ATE: <br /> Items Requiring Follow-up Actions: JUN 04 26 J <br /> ENVINUNIALWAL w <br /> ut:PARTMEr <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator, but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months. Records must be maintained on-site or, if approved by the local agency,off-site at a readily <br /> available location. <br />