Laserfiche WebLink
Facility Employee Training Pa e 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. x <br /> All facility employees hired within the past 30 days have received the required on the job training. g <br /> Monthly Inspection— <br /> Y N NA Date Done <br /> Monitoring system certification(within past 12 months) X 10-9-IT- <br /> Spill Bucket testing completed(within past 12.months) X 10-9-17 <br /> Leak Detector-mechanicaVelectronie for most sites(within past 12 months) X 10-9-17 <br /> The above are usually done together on an annual basis for local regulator, <br /> Line Tightness(usually upon construction or when no positive shutdown) x <br /> Tank Tightness(Usually only after construction or when using SIR) X <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) JDATE: 10-14-15& <br /> 2-24-16 <br /> Other testing or maintenance completed as required. List them below: <br /> TesNMaintenerace: <br /> Test/Mamtenance: <br /> Test/Maintenance: <br /> PRINTOUT INCLUDED: Yes® No ElNA❑BINDER UP TO <br /> Comments: <br /> Items Requiring Follow-up Actions: <br /> NME <br /> pA" <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator, but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months. Records must be maintained on-site or, if approved by the local agency,off-site at a readily <br /> available location. <br />