Laserfiche WebLink
`, RECEIVED <br /> SWRCB,January 2002 MAR 25 iU of_ <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: UDC Manufacturer ❑Industry Standard WaRriwamrT <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC#1&2 UDC#3&4 UDC#5&6 UDC#7&8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30'h" 30 %2" 30 %2" 30'/d <br /> Height from UDC Bottom to Top 8" 13" 8" 12" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 14" 14" 13" 15" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested' *See Comments *See Comments *See Comments *See Comments <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both <br /> product and water?. <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?* <br /> Was fail-safe verified to be <br /> operational?* <br /> Wait time between applying <br /> water and starting test <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Chane in Readin (RF-Ri): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: <br /> Was sensor removed for testing? <br /> Was sensor properly replaced and <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UDC's not tested with this testing event. <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />