Laserfiche WebLink
RECEIVED <br /> D. Results of Testingl5ervicing <br /> II?Ae 2 2 01 <br /> Software Version Installed <br /> M <br /> the followin checklist: <br /> ❑ No' Is the audible alar operational? , <br /> ❑ No' Is the visual alar operational? <br /> ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,madam)oparatonal7 <br /> ® NIA❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment montionng system detects a leak❑ NIA fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) ® Sumprrrench <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confr positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. vention valve is <br /> overni <br /> is <br /> nical ove <br /> ❑ No' instForalled nk ssstems that the overfillutilize the wami8 a artoringvisible antl udible al the tnk filll postem as me primary tank int sl)and operating properly?mIf esoaat what pe Incenot tank capacity® NIA does the alar trigger? %® No. Was any monitoring equipment replaced? Ifyes,identify specficsensors,probes,or other equipment replaced antl Iislthe manufacturernameand model for allrplacement partsinSection E,bel® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product ❑Water. If yes,describe causes in Section E,below. <br /> ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach setup reports,'dapplicable <br /> Yes ❑ No' Is all monitoring equipment operational per manufacturers specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 2/21 i07 <br />