My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - PRESENT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
COMPLIANCE INFO 2016 - PRESENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 9:23:19 AM
Creation date
11/7/2018 1:13:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - PRESENT
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\Y\YOSEMITE\707\PR0505151\COMPLIANCE INFO 2016 - PRESENT .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> D. Results of Testingl5ervicing <br /> II?Ae 2 2 01 <br /> Software Version Installed <br /> M <br /> the followin checklist: <br /> ❑ No' Is the audible alar operational? , <br /> ❑ No' Is the visual alar operational? <br /> ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,madam)oparatonal7 <br /> ® NIA❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment montionng system detects a leak❑ NIA fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) ® Sumprrrench <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confr positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. vention valve is <br /> overni <br /> is <br /> nical ove <br /> ❑ No' instForalled nk ssstems that the overfillutilize the wami8 a artoringvisible antl udible al the tnk filll postem as me primary tank int sl)and operating properly?mIf esoaat what pe Incenot tank capacity® NIA does the alar trigger? %® No. Was any monitoring equipment replaced? Ifyes,identify specficsensors,probes,or other equipment replaced antl Iislthe manufacturernameand model for allrplacement partsinSection E,bel® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product ❑Water. If yes,describe causes in Section E,below. <br /> ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach setup reports,'dapplicable <br /> Yes ❑ No' Is all monitoring equipment operational per manufacturers specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 2/21 i07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.