My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - PRESENT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
COMPLIANCE INFO 2016 - PRESENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 9:23:19 AM
Creation date
11/7/2018 1:13:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - PRESENT
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\Y\YOSEMITE\707\PR0505151\COMPLIANCE INFO 2016 - PRESENT .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> The following is an itemized list of underground storage tank viol do s tta,>tyt a not <br /> been addressed for QUICK[ KLEEN CAR WASH as of March29; 20;" ftt9 <br /> Open violations from October 11, 2016 inspection <br /> Violation #103 -Current financial responsibility documents not submitted. <br /> Financial responsibility documents have not been submitted to the EHD, the most recent financial responsibility <br /> submitted into CERS is dated 11-28-2014. Current financial responsibility documents are required to be submitted <br /> annually. Immediately log into the California Environmental Reporting System (CERS) at http://cers.calepa.ca.gov/, <br /> and upload the required documents. <br /> Violation#105 -Failed to have an approved UST monitoring plan. <br /> The monitoring plan is not current and/or not approved by the EHD, the submitted plan indicated external <br /> audible/visual as an overfill protection in addition to the fill tube shut-off valve, no external audible visual alarm was <br /> observed at the time of inspection. Also monitoring for the secondary containment of onsite UDCs was identified in <br /> the reviewed monitoring plan, the onsite UDC's are single walled. The updated monitoring plan must be uploaded to <br /> the California Environmental Reporting System (CERS). Immediately log into CERS, make the necessary changes, <br /> and submit for review by the EHD. <br /> Violation #110- Failed to submit secondary containment test report within 30 days. <br /> Secondary containment testing was performed on 10-14-2015 and a test report was submitted on 12-11-2016 , <br /> approximately 1-month late. A copy of the test report must be submitted within 30 days of the tests. Take all <br /> necessary precautions to ensure testing and submittal of test reports are performed in a timely manner. <br /> Violation #121 - Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on 10-21-2015 and an inspection report was issued identifying information to be <br /> submitted to bring this site into compliance. This information was required to be submitted by 11-21-2016. This <br /> information has not been received resulting in a non-compliant status for this facility. An operator that receives an <br /> inspection report shall have 30 days to submit a written response that includes a statement documenting corrective <br /> actions taken or proposing corrective actions which will be taken. Ensure that a written response documenting <br /> corrective actions taken or proposed is submitted within 30 days of receiving an inspection report. <br /> Violation #204 -Current monitoring plan approved by the EHD not found on site. <br /> An approved copy of the monitoring plans were not available for inspection. The monitoring plan indicated external <br /> audible/visual as an overfill protection in addition to the fill tube shut-off valve, no external audible visual alarm was <br /> observed at the time of inspection, also monitoring for the secondary containment of the UDCs was identified (the <br /> onsite UDC's are single walled). A copy of these plans shall be accessible on site at all times. Immediately locate <br /> and retain a copy on site. <br /> Violation #209 - Designated operator did not inspect all required items and/or the inspection reports not <br /> completed. <br /> The designated operator failed to check and note the correct test dates for the spill bucket testing and leak detector <br /> testing on the 6-1-16 and 7-1-16 designated operator monthly inspection report. The test dates were listed as <br /> 2-19-2016 instead of 10-21-2015. Furthermore, the following inspection reports indicated that premium tank spill <br /> containers were inspected, only 87-octane and diesel tanks are installed at this site: 2-5-16, 3-30-16, 8-29-16, and <br /> 7-1-16. During the monthly inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. Ensure that <br /> designated operators performing monthly inspections at this facility are including all of the required information on <br /> the reports. <br /> Violation#210 -Designated operator monthly inspection reports not maintained on site for at least 12 <br /> months. <br /> The September 2016 and the second page of the 10-21-15 designated operator monthly inspection reports were not <br /> found on site. Designated operator monthly inspection reports for the previous twelve months shall be retained on <br /> site. Locate and ensure that copies of the previous twelve months of designated operator monthly inspection <br /> reports are maintained on site. Submit copies of missing reports to the EHD. <br /> Open violations from October 21, 2015 inspection <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.