My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - PRESENT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
COMPLIANCE INFO 2016 - PRESENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 9:23:19 AM
Creation date
11/7/2018 1:13:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - PRESENT
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\Y\YOSEMITE\707\PR0505151\COMPLIANCE INFO 2016 - PRESENT .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard X Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#1-87 Sump#2-87 Sump#3-Diesel Sump# <br /> Sump Diameter: 46"Hexagon 46" Hexagon 46" Hexagon <br /> Sump Depth: 38" 38" 38" <br /> Sump Material: Poly Poly Poly <br /> Height from Tank Top to Top of 8" 8" 8" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 6" 6" 6" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' Water Level 12" Water Level 12" Water Level 12" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes <br /> product and water)?. <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes Yes <br /> shutdown?* <br /> Was fail-safe verified to be No No No <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 10:55 11:00 11:05 <br /> Initial Reading(R,): .001 .001 .001 <br /> Test End Time: 11:25 11:30 11:35 <br /> Final Reading(R,:): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(Ri:-R,): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005130 Minutes .005/30 Minutes <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? X Yes .No NA X Yes No NA X Yes No NA Yes No NA <br /> Was sensor properly replaced and X Yes No NA X Yes No NA X Yes No NA Yes No - NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> TAU- <br /> 140e,41 N- <br /> M. .� <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.