Laserfiche WebLink
s <br /> SAN JOAQIWOUNTY ENVIRONMENTAL HEALTI19PARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 1 <br /> 17 111 <br /> M01. <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION :i7- <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 03 OCT 27 <br /> Moz. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY'INFORMATION <br /> FACILITY ID#(Agency Use Only) - <br /> M03. <br /> FACILITY NAME p <br /> (^ M05. <br /> FACILITY SITE ADDRESS <br /> II. EQUIPME T TESTING AND PREVENTIVE MAINTENANCE <br /> te law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> Sta <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. h107. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS' <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materiels B:sincss Plan,ma-,etc 1 xhich shows 20 required infinmRtion,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M1o. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: DRY b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M° <br /> PANEL MANUFACTURER: 61 1 0 �L M12. MODEL#: M13. <br /> a. <br /> LEAK SENSOR MANUFACTURER: 94L0 �OV M14. MODEL#(S): <br /> MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) M17 <br /> PANEL MANUFACTURER: MI6. MODEL#: <br /> Mia MODEL#(S): <br /> M19. <br /> IN-TANK PROBE MANUFACTURER: <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> El d.MONTHLY 11e.OTHER(Specify): M21' <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2gP h. Elc.OTHER(Specify): M22. MD. <br /> ❑ 3.INVENTORY RECONCILIATION [Ia.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 M25 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 M26 W7 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> 6NISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY(Requires agency avprovap <br /> M29. <br /> 99.OTHER(Specify): <br /> V. PPIPE MONITORING <br /> M30. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)(TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: p�(t/rr�a.DRY Elb.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM Mat. <br /> PANEL MANUFACTURER: int(lI GO1Iec MODEL#:fr," �+ M32. M33. <br /> M35, <br /> LEAK SENSOR MANUFACTURER: \1 Q-C M34. MODEL#(S)' <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? a.YES [-Ib.NO N06.z <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? % a.YES [Ib.NO <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND STRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS D TECTED ' n M39. <br /> MLLD MANUFACTURER(,: R'Q MODEL#(S):DC I�'� Mn' <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS M41 <br /> ELLD MANUFACTURER: M40' MODEL#: <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. <br /> M42, <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILUREIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> M44. <br /> ❑ 4.INTEGRITY TESTING M45. M46. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> 5.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY" ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED-- M47. <br /> •Requ'ves a,,my approval ••Allowed for monitoring ofunburied emergenry generates fuel piping only per HSC§25291.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) Mos. <br /> ❑ 99.OTHER(Specify) <br /> 07/23/03 <br /> SJCEHD-d(07/03)-1/4 <br />