Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN—(Pave 2 of 2 <br /> VI.UNDER DISPENSER CONTAINMENT(UDC) MONITORING (check all <br /> hat a <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> a <br /> 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY [13.ELECTRONIC STAND-ALONE 490W.Mbsob. <br /> _❑ 4 NO DISPENSERS _ _ _,_. 0.99 OTHER(Specify) <br /> LEAK MONITOR MANUFACTURER (^t r,1=htoo 99x55. MODELH: -4107c 490.56 <br /> LEAK SENSOR MANUFACTURER49x51. MODELM(S):�/300 ," eSS9 2- aw.ss. <br /> : �' � 1 1-✓<Y C r) <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. M a.YES ❑ b.NO d90S4- <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a <br /> a.YES ❑ b.NO 49660. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 9 a.YES ❑ b.NO 090d1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER V5 a YES ❑ b NO 49x6$. <br /> _ ____.... <br /> ._—__.... - __. _ 490.63. <br /> UDC CONSTRUCTION IS: ❑ I.SINGLE WALL �2.DOUBLE WALL <br /> 49x694 <br /> IF DOUBLE WALL: r�f <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ) a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO <br /> 49069'. <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49°'65. <br /> L E D MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR gx,9a.11 49x66 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49oa <br /> ® 7. <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VIII. RECORD KEEPING <br /> 491dB. <br /> The following monitoring/maintenence records are kept for this facility: <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: 49x694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ®THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 4904% <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49x69`. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-W <br /> ❑ 49x69e <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW . <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" 490-691 <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49ebm <br /> ❑ <br /> OTHER(Specify): a9069t. <br /> This facility hes a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 49 70, <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> Y The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> • Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate now manly pages with addirioml information on specific monitoring procedures are attached to this plan. <br /> 90.11. <br /> a I ° -', r <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST OwnedOPeramr is responsible for ensuring thaC 1.)the daay/rodfine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2)all conditions that indicate apossible release are investigated. 3)all monitoring records are mamtainedpr y <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE <br /> 490.13 <br /> NAME: n <br /> TITLE: G�-�^�!?{" . <br /> J)1'N."'y) �.�C'*-v 494.74 a9an. <br /> NAME: ,l 71TLE: <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform theowner/opemtor of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information prarvided herein is true and accurate to the best of my knowledge. 49x11 <br /> APPLICANT SIGNATURE - _._—�-- DATE: <br /> REPRESEN'rnln: I.TN Omirt 3.Ferilin Oxner/ err 3.Aw'ai>Wa reenuave of nxner 490.19.49076. 49019. <br /> APPLICANT NAME(print): APPLICANT TITLE: <br /> ek-e9. <br /> -11, f,1 77 T1, Cr`3'y <br /> UPCF UST-D(122007)-314 rvw3r.nrddors.ora <br />