My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:33:41 AM
Creation date
11/7/2018 3:42:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\2650\PR0232573\COMPLIANCE INFO 1992-2014.PDF
QuestysFileName
COMPLIANCE INFO 1992-2014
QuestysRecordDate
8/2/2017 3:55:42 PM
QuestysRecordID
3544390
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/30/2002 MON 08:29 FAT, 2098333146 31AINT & ENGINE SHOP � 0004/007 <br /> WWTTEN MONI'l'ORING AND USPONSE PLAN <br /> UNDERGROUND STORAGE TANK.MONITORING PROGRAM Program are <br /> ST loc- <br /> Thus monitoring pr°°�t mubkThe p mut bolder must notify Fnvirolr,.men alhealth Department,ztion an at{209)4f$-3420 <br /> conditions of the operating permit. o rocedures,tmless requited to obtain approval or a permit before making <br /> within 30 bays of any changes to the moat ttan. (h). <br /> the change.Required by CCR 2632(d) <br /> !_ !� <br /> SIli J DATE <br /> � `1'537 <br /> FACILTIY NAME Q /� <br /> FACILITY ADDRESS_ e&�L <br /> 1.Narne(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br /> VIMQc '-% <br /> 2 <br /> 2.Describe the frequency of performing the monitoring for: <br /> PIPING <br /> TANKS <br /> )of where the monitoring will be performed. location ofselasors <br /> 3.Describe the locations <br /> 4.Describe the following equipment for each Irnderground storage tank, o <br /> E <br /> ED <br /> Name and Model of Monitoring Panel <br /> Name and Model of bine Leak Detectors <br /> Narne and Model of Annular Sensors <br /> �. <br /> Name and Model of Piping Sensors $ S57� <br /> Name and Model of Dispenser sensors 006 �O <br /> 'Type of overfill prevention , <br /> AGr��r� <br /> 5.1)o the Turbine sensors and Dispenser Pan seztsors shut down the lurbine? Yes© �o d N A <br /> Does the turbine shut down if a sensor is disconnected? Yes❑ leTa 11Does the turbine shut down is the monitoring panel loses power? <br /> 6,How will the alarm history and subsequent maiatenoLnee be rcoorded2 N - <br /> A <br /> t� <br /> 7.Maintenance of the monitoring equipment must be perforedat least once everY 12 f r the m n toting equipment.recodinWhat month will <br /> Describe the preventive maintenance schedule and g <br /> annual monitoring certification be performed i <br /> Note,For new fnsralfatfons the secondary confainni�t mus be tested <br /> before months <br /> ntJayh a after <br /> installation_All secondary containment systems <br /> Hirst be rested once every 36 mond"%vitfi lnit 1�P performed <br /> far the operation of UST system,including piping,and the monitoring <br /> 8.Describe the training necessary �+ <br /> equipment. " /'u4/Ih11a 'T��v/G g+�S ptvt'-1 <br /> {kf- T�5 Z.sa <br /> I NI)nft 1111L1ST\mnnitoringplan•dN <br /> 5/3Ql24o2 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.