My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
1319
>
2300 - Underground Storage Tank Program
>
PR0231162
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 3:16:41 PM
Creation date
11/7/2018 3:50:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231162
PE
2381
FACILITY_ID
FA0003728
FACILITY_NAME
PLYMOUTH SQUARE
STREET_NUMBER
1319
Direction
N
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
1319 N MADISON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MADISON\1319\PR0231162\COMPLIANCE INFO 1986-2002.PDF
QuestysFileName
COMPLIANCE INFO 1986-2002
QuestysRecordDate
9/1/2017 7:32:33 PM
QuestysRecordID
3620731
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M E M O R A N D U M <br /> TO: Mr. Delmar Bolton, Plymouth Square <br /> FROM: Pam Violett, San Joaquin County Environmental Health Div. <br /> DATE: October 18, 1993 <br /> RE: Underground Storage Tank (UST) at 1319 N Madison, <br /> Stockton <br /> In the course of performing a review of the UST file for the above- <br /> referenced site, I noticed you have not had an inspection for quite <br /> some time. Consequently, I wanted to send you some updated <br /> information regarding your UST, and in addition, provide you with <br /> a new table to be utilized in the monitoring of your UST. I am <br /> sending you only one copy of Table TPS-1, so please use this copy <br /> as your original and make additional copies as necessary. <br /> You will note on the Tank Performance. Standards hand out, only <br /> those UST ' s greater than 550 gallons require an annual tank test. <br /> Our records show your UST' s capacity at 350 gallons. If this is <br /> accurate, you need not have the tank tested at all. However, if <br /> the UST has any piping associated with it, a triennial line test <br /> would be required (see Piping Performance Standards hand out) . For <br /> inspection purposes, you need only to maintain all monitoring <br /> records on site available for review, and no documentation is <br /> required to be submitted to this office other than the results of <br /> line tests, as you have fulfilled in the past. <br /> I have also enclosed some Financial Responsibility information. <br /> This issue will need to be addressed by December 31, 1993 . <br /> 1 hope this clarifies the required monitoring for your UST. If you <br /> should have any questions, please feel free to contact me at <br /> (209) 468-0335 . <br /> Pamiolett, Senior R. E.H. S. <br />
The URL can be used to link to this page
Your browser does not support the video tag.