My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1071
>
2300 - Underground Storage Tank Program
>
PR0231431
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:01:30 AM
Creation date
11/7/2018 4:08:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231431
PE
2361
FACILITY_ID
FA0000514
FACILITY_NAME
MAIN STREET SHELL*
STREET_NUMBER
1071
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21707011
CURRENT_STATUS
02
SITE_LOCATION
1071 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1071\PR0231431\INSTALL 1987.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ap <br />0 0 <br />UNDERGROUND TANK INSPECTION RECORD <br />NEW TANK INSTALLATION <br />SITE NAME_,SftC- <br />. ADDRESS C, <br />CONTRACTOR: NAME <br />y - <br />OWNER: NAME i°'1" ' r.a �� "� i /lei c PHONE <br />INSPECTOR'S NAME <� _� <br />CITY r? zip <br />PHONE <br />Comments: <br />DIS <br />INSPECTOR'S <br />IPING STAGE INSPECTION <br />1. Pressure test of piping. (Primary and Secondary (NFPA 30)] <br />DATE <br />kPPROVED <br />PPROVED <br />INITIALS <br />2. Batt float valves instatted. <br />. Tank tested upon delivery (Hotiiday (ptasteel) or air at 5 PSI (FRP)] <br />ITEM OR EQUIPMENT INSPECTED <br />3. Visual inspection of secondary containment. <br />1. Fees paid <br />Plans Approved <br />5. Performance test of continuous monitoring system(s) on tank (s) <br />Comments: <br />INITIAL INSPECTION <br />IPING STAGE INSPECTION <br />1. Pressure test of piping. (Primary and Secondary (NFPA 30)] <br />1. UL numbers tank size <br />2. Batt float valves instatted. <br />. Tank tested upon delivery (Hotiiday (ptasteel) or air at 5 PSI (FRP)] <br />3. Overfill protection installed, describe: <br />3. Visual inspection of secondary containment. <br />4. Tank appropriatety pieced with approved backfill. <br />Comments: <br />IPING STAGE INSPECTION <br />1. Pressure test of piping. (Primary and Secondary (NFPA 30)] <br />2. Batt float valves instatted. <br />3. Overfill protection installed, describe: <br />4. Performance test of product line leak detector. (Hard wired) <br />4. Unused tank opening sealed and cathodically protected. <br />5. Visual inspection of secondary containment on piping. <br />5. Performance test of continuous monitoring system(s) on tank (s) <br />6. Monitoring ports in place and brought to grade. (lockable weather proof covers) <br />6. Permit to operate application complete. <br />7. Fill and vent piping brought to grade. <br />7. Acceptable recordkeeping system. <br />B. Product line teak detector in piece. (Hard wired) <br />4. Approved tank teak monitoring device installed. <br />10. All galvanized piping and fittings properly wrapped. <br />1. Pressure decay test on complete tank and product delivery system. <br />Comments: <br />INAL INSPECTION <br />1. Precision test successfully completed and hard copies received. (NFPA 324) <br />2. Spill protection at fill pipe. <br />3. Performance test of overfill protection system. <br />4. Performance test of product line leak detector. (Hard wired) <br />5. Performance test of continuous monitoring system(s) on tank (s) <br />6. Permit to operate application complete. <br />7. Acceptable recordkeeping system. <br />Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.