Laserfiche WebLink
OPTION ,_ 2A <br />ARTICLE 3, SECTPON 2633/2634 , <br />MOTOR VEHPCLE FUELS ONLY <br />CON'STRUCTIOM <br />�_,`� ...�• Requirements; <br />A. Approved tank construction material <br />f B. Leak interception and detection system which complies with Article 3, <br />Section 2631(c). , <br />C. Membrane liners must comply with Article 3, Section 2633(e), (1), (2), <br />(3)• (4).( S) and are only allowed for piping systems (Department Policy) <br />D. Oemonstrate that the leak interception and detection systems protects <br />Me <br />und water from contamination (Article 3, Section 2633(f), (1), (2), (3), <br />(5)o (6), (7). <br />E. Pressurized piping systems must be installed with a leak detector that is <br />Capable of automatically shutting off the product pumps. <br />I. Any single wall component "tank or piping" requires daily inventory <br />reconciljiation and annual precision tests as part of the monitoring <br />4 <br />F. Before covering, the tank(s) and system(s) must be tested to NFPA 300 <br />Standards. <br />G• Before use - the tank(s) and System(s) must be tested in accordance to <br />NFPA 329• <br />H. Provide soil profile of vadose zone if membrane liners are used. <br />OPTI--�- ON B <br />ARTICLE 3, SECTION 2634 <br />MOTOR VEHICLE FUELS ONLY <br />MONITORI <br />—_sl• Requirements (leak interception and detection system(s)). <br />A. Floor must be constructed on a firm base and sloped to a collection sum. <br />Q• Access casings must be installed in accordance to Article 3. Section A <br />2G34 (c) 0 thru G), (d) (1)• <br />C. Submit written monitoring and response plan as stated in Article 3, <br />Section 2634 (d) (1-3), 2634(e) <br />O. Hard wiring of electronic monitoring systems is required. <br />E. Provide manufacturer's written installation instructions. <br />M <br />