Laserfiche WebLink
caw/dw/dwwo <br /> CONTINUOUS ELECTRONIC MONITORING OF TANKS AND PIPING <br /> TANKS <br /> Tank Applicability, see Underground Tank Written Monitoring Plan <br /> All Underground Fuel Storage and Waste Oil Tanks are Double Wall Fiberglass construction. Manufactured by <br /> Owens Corning. <br /> PRODUCT LINES <br /> All Product line construction is Double Wall Fiberglass. <br /> TANK LEVEL MONITOR - VEEDER ROOT- TLS 3501 SIMPLICITY#848295-102 <br /> TRAINING The training necessary to operate the tank and line monitoring system is performed by the authorized <br /> installation service contractor per manufacturer guidelines. The location is also responsible for daily inspection of <br /> the monitoring panel, Alarm Panel Test Log and corrective actions. <br /> TANK AND LINE TESTING <br /> The Veeder Root system installed at this location provides continuous electronic leak detection monitoring <br /> of the product tanks and pressurized product lines. In the event that a leak is detected, the system provides <br /> automatic notification through the phone line or satellite dish to Veeder Root. Optional audible and visual <br /> alarms can also be programmed. Hard copies of monthly tank test results are to be mailed to the station the <br /> first week of the following month. <br /> Tanks (Product and Waste Oil);continuous electronic monitoring of the WET annular/interstice space. 0.2 <br /> gallons per hour (gph) continuous testing of the product primary tanks. A malfunctioning tank will result <br /> with an alarm automatically transmitted to the Veeder Root company which would in turn contact their <br /> service contractor for investigation and repair. If a leak occurred in the primary tank, the water or brine <br /> solution would leak into the tank. No product would leak into the secondary containment of the tank. <br /> Waste Oil Tank 550 gallon double wall fiberglass. No remote fill lines (removal scheduled 1998 upgrade). <br /> Pressurized Product Lines; continuous electronic testing 3.0 gph gross (positive shutdown), 0.2 gph <br /> (monthly/alarm) and 0.1 gph (annually/alarm) in combination with a liquid sump sensor. Both designed for <br /> positive shutdown in the event of leak detection. If a leak occurred here the result would be product line <br /> shut down with no leak to ground [(Dry) annular/interstice]. A malfunctioning product line will result with <br /> an alarm automatically transmitted to the Veeder Root company which would in turn contact their service <br /> contractor for investigation and repair. <br /> UNAUTHORIZED RELEASE RESPONSE PLAN <br /> See Hazardous Materials Management Plan (fMMP) located in the Health, Safety and Environmental <br /> 'Green Book"located at the station for more detail; emergency response plan; procedures and Equilon <br /> Leak Response Plan. <br /> Emergency response is 4 hours maximum. The service contractor will notify the appropriate Equilon <br /> Personnel in the event of an actual tank/line failure. Alarms which are or are not the result of an actual <br /> tankiline failure will be repaired in accordance with manufacturer's recommendation and all local and state <br /> requirements. <br /> Preventive maintenance schedule: <br /> This system is interfaced to the manufacturers computer system via satellite dish or phone line and is <br /> continuously being poled for communication. When the system alarms Veeder Root notifies their <br /> Authorized Service Organization (Service Station Systems) to respond and make necessary repairs. The <br /> system is calibrated and certified operational annually with submittal of the results to the appropriate Local <br /> Agency. <br /> dw/dw/dwwo <br />