Laserfiche WebLink
CODE OFI2EGUI,ATIONS Title 22 <br /> Title 22 Environmental Health Standar <br /> � <br /> quitements of chapters 14 and 15 of this division and the permit require- <br /> HAZARDOUS WASTE-State and Federal Law Prohibit Improper mens of chapter 20 of this division. and <br /> Disposal.If found,contact the nearest police or public safety authority, - (I)For purposes of this subsection,tank does not include a portable on <br /> the U.S.Environmental Protection Agency orthe California Department - tank marked or labeled in compliance with subsection(f)of this section <br /> of Health Services. and meeting either of the following conditions: wa: <br /> Generator's Name and Address (A)the portable tankis used to store hazardous waste onsite which has W. <br /> Manifest Document Number been generated from onsite maintenance operations which occur less fre- wit <br /> Nore Authority cited:Sections 208,25150,25159 and 25161,Health and Safety quently than annually;or <br /> Cade.Reference:Sections 25159,25159.5 and 25160,Health and Safety Code; (B)the portable tank is used to store hazardous waste onsite for a peri- <br /> 40 CFR Section 262'32' HISTORY od of not more than 60 consecutive calendar days. and <br /> 1.New section filed 5-28-91;operative 7-1-91(Register 91,No.22). (2)For purposes of this subsection,portable tank means any transport- <br /> able covered or uncovered receptacle to be used for holding hazardous No, <br /> §66262.33. Plaearding. waste and having a capacity greater than 110 U.S.gallons. Ref <br /> Before transporting hazardous waste or offering hazardous waste for (e)(1)A generator may accumulate as much as 55 gallons of hazardous CFI <br /> transportation off-site,a generator shall ensure that the transport vehicle waste, one quart of acutely hazardous waste (listed in section 1 1, <br /> is correctly placarded according to Department of Transportation regula- 66261.33(e))or one quart of extremely hazardous waste at or new any <br /> tions for hazardous materials under Title 49 CFR Part 172,Subpart F. point of generation,without a permit or grant of interim status,without <br /> Nate:Authority cited:Sections 208,25150.25159 and 25161,Health and Safety complying with subsections(a),(b)and(e)of this section,if all of the fol- <br /> Code.Reference:Sections 25159,25159.5 and 25160,Health and Safety Cade; lowing requirements are met with respect to this waste: <br /> 40 CFR Section 262.33. §6 <br /> HtsroRY (A)the waste is accumulated in containers,other than tanks,at tiro inti- ( <br /> 1.New section filed 5-24-91;effective 7-1-91(Register 91,No.22). tial accumulation point which is at ornear the area where the waste is gen- do. <br /> crated and which is under the control of the operator of the process gener- <br /> §66262.34. Accumulation Time. acing the waste; cei <br /> (a)Except as provided in subsection(d)of this section,a generator (B)the generator dcesnot hold the waste onsite for more than one year <br /> wa <br /> may accumulate hazardous waste on-site for 90 days or less without a from the initial date of accumulation,or 90 days from the date the quantity ye( <br /> permit or grant of interim status,provided that. limitation specified in subsection(e)(1)of this section is reached,which- <br /> (1)the waste is placed in containers and the generator complies with ever occurs first; tint <br /> article 9 of chapter 15 of this division,or the waste is placed in tanks and (C)the initial date of waste accumulation is clearly marked and visible Put <br /> the generator complies with article 10 of chapter 15 of this division,ex- For inspection on each container used for accumulation of hazardous <br /> cept sections 66265.197(c)and 66265.200.In addition,such a generator waste; or( <br /> is exempt from all the requirements in articles 7 and 8 of chapter 15 of (D)the generator complies with sections 66265.171,66265.172,and lea: <br /> 56226565 <br /> this division,except for sections 66265.111 and 66265.114;and off. <br /> .173(a)of this division;and l <br /> (2)the generator complies with the requirements of subsection(t)of (E)the generator complies with subsections(e)(2),(e)(3)and(f)(3)of <br /> this section;and his section. ton <br /> (3)the generator complies with the requirements for owners or opera- (2)Except as provided in subsections(e)(2)(A)and(e)(2)(B)of this gar <br /> tors in articles 3 and 4 of chapter 15 of this division and with section action aprocessorgroupofprocessesmcetingtherequirementsofsub- No <br /> too <br /> 66265.16; ection(e)(1)of this section,shall be subject to a single 55 gallon or one Cot <br /> (4)the generator complies with the requirements for owners or opera- luau accumulation limit for that process or group of processes. 40 i <br /> tors in article 3(commencing with section 66265.30)and (commencing (A)If not all of the wastestreams generated by a single process or <br /> with section 66265.50) of chapter 15 of this division and with section group of processes located within the same physical area are compatible, 1.11 <br /> 66265.16. :separate 55 gallon or one quart limit shall apply to each group Of wastes- §6 <br /> (b)The beginning of the 90 day period specified in subsections(a)and reams that are compatible. <br /> (c)of this section is determined as follows: (B)If the generator determines that using only one 55-gallon or one- tres <br /> (1)if the generator does not generate more than 100 kilograms of haz- uart container to initially accumulate specific compatible wastestreams par <br /> ardous waste or one kilogram of acutely hazardous waste(listed in sec- ;not practical(e.g.,prevents recycling or requires unreasonable accu- 87( <br /> tion 66261.33(e))or one kilogram of extremely hazardous waste during aulation procedures) or safe from an environmental or worker/public eat <br /> any calendar month,the 90 day period begins on the date the generator ealth and safety standpoint,the generator may use a separate 55-gallon fon <br /> has accumulated 100 kilograms of hazardous waste or one kilogram of r one-quart container for those specific compatible wastesuearns.The dui <br /> acutely hazardous waste or one kilogram of extremely hazardous waste; enerator's determination shall be subject to review and approval by the ma' <br /> (2)if the generator generates more than 100 kilograms of hazardous kpanment at anv time. <br /> waste or one kilogram of acutely hazardous waste or one kilogram of ex- (3)A generator who has accumulated an amount of hazardous waste, <br /> tremely hazardous waste during any calendar month,the 90-day period :utely hazardous waste or extremely hazardous waste equal to any <br /> begins on the first date on which any amount of hazardous waste begins pplicable quantity limitation listed in subsection(e)(1)of this section at trar <br /> to accumulate during that month. r new any point of generation shall,with respect to that waste,comply wh, <br /> (c)A generator who accumulates hazardous waste for more than 90 ithin three days with subsection(a)of this section and other applicable <br /> days is an operator of a storage facility and is subject to the requirements Vvisions of this division.During the three day period the generator shall ing <br /> of chapters 14 and 15 of this division and the permit requirements of mtinuetocomply with subsection(e)(1)of this section.Within the three dial <br /> chapter 20 of this division,unless the generator has been granted an ex- ty period,the generator shall mark the container holding the hazardous <br /> tension to the 90-day period or meets the requirements of subsection(e) ante with the date the applicable quantity limitation was reached. ticl <br /> of this section.An extension may be granted by the Departmentif hazard- (f)Generators who accumulate hazardous waste on site without a per- ber <br /> ous wastes must remain onsite for longer than 90 days due to unfore- it or grant of interim status shall comply with the following require- eat <br /> seen,temporary,and uncontrollable circumstances.An extension of up ) ents: disl <br /> to 30 days may be granted at the discretion of the Department on a case- 't <br /> (1)the date upon which each period of accumulation begins shall be by i <br /> by­case basis. early marked and visible for inspection on each container and portable shil <br /> (d) A generator who stores more than 5000 U.S. gallons or 45,000 nk; bel <br /> pounds,whichever is greater,of hazardous waste onsite in a tank for any <br /> period of time is an operator of a storage facility,and is subject to the re- <br /> 694Page 695 <br /> Reglvn 91 tin.18:5-1-92 <br />