Laserfiche WebLink
6 0 <br /> t2 handling of excavated soil: <br /> a) What material will be used to line and cover the tank & piping stockpile placed on the ground? <br /> llv^tv duly n1a51 it IteP .lu <br /> b) What will be the disposition of the tank & piping stockpile after analysis?_ a Lioll If eou- <br /> edL Le <br /> —1LQjL_S�lul£_t--eaU st -e_Ueau� rLrnat f L e e L meL od of LreaUneul, will be made <br /> ��ulivaLlsuiisJsztaud�ae tt 'tt . <br /> of l� Llte exl f'uL of c AL roan L' In i; I ified. <br /> 13. What Is the depth to groundwater? Uulutown <br /> Describe the source of information: <br /> YES NO <br /> NO� <br /> 14. Are there any wells on thLs parcel or adjacent properties? <br /> ItyOF t�•FLIS DISTANCE TO T,1NKS(S) <br /> PE <br /> Public Well rL <br /> Private Well ft <br /> Irrigation Well ft' <br /> Monitoring Well fL <br /> OtherI — i <br /> ft. <br /> 15. Will the tanks) pending closure be replaced with an aboveground or underground storage lank(s) and has the <br /> responsible party submitted a 'Letter of CommilmenC to PrISlEF{D7 <br /> lltis lufvrmaLiun i:. uut lutuwu by conLracLor aL Lhis Lime. <br /> Page 6 <br /> closplan (nev 4/22/91) wp <br />