Laserfiche WebLink
• ww Doan V—llnoliRl AIR? <br />niaoorator1CS tYv auloau vc - <br />iervice Project Number: 2498 East Main <br />Project Name: EI Camino Tire Work Order <br />CA N/A Project Manager: Don Light H70105i <br />STLC Metals <br />Reporting <br />Analyte <br />Result Limit Units Dilution Analyzed Method Notes <br />Pump Ent/20" (H701052-09) Soil Sampled: 25 -Jan U7 ":LU KMIVM: Bowan-vl .o:c. <br />Lead <br />42 0.20 mg/L I <br />Approved By <br />Argon Laboratories, Inc. California D.O.H.S. Cert. 42359 <br />30 -Mar -07 EPA 7420 <br />Page 2 of 4 <br />