Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-(Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING tCheck all <br /> rhal apply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490'54n <br /> 4.NO DISPENSERS ❑ 99.OTHER S i 490-54b. <br /> LEAK MONITOR MANUFACTURER: MODEL# 490.56. <br /> LEAK SENSOR MANUFACTURER: 490-57, MODEL 4(S): 490-5& <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO °904'0 <br /> FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490.61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑ b.NO 49042. <br /> UDC CONSTRUCTION IS: ❑ 1.SINGLE WALL ❑ 2.DOUBLE WALL 49063. <br /> IF DOUBLE WALL: 49064" <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 49046. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY INS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-5. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.123 CCR§2w4 11 <br /> ❑ 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 4s0a6. <br /> ❑ 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490�3- <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 4906e. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® <br /> It.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ❑ Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 49os9a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490c96. <br /> ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 4906x. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49 91 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490a9e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49a69f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49069&. <br /> ❑ <br /> OTHER(Specify): 490-691'. <br /> 490691. <br /> ❑ This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council 49090 <br /> (ICC). The "Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. p90-01, <br /> The tanks are not in use and will be p=ped out, cleaned, dry iced, and the turbines removed. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2. all conditions that indicate a possible release are inves[i a[ed'and 3, all monimrin records are maintained ro rl . <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: 490.92. TITLE: 490-73. <br /> NAME: 49674. TITLE: 49005. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE Chevron Products Coi ERIC MUNNS DATE: 49611, <br /> REPRESENTING'.®1.Trak Oxmer/O for 2.Fnifi Owner/O 0101 3.Amon k ®enuuve of Owner 49 76. 04/1012008 <br /> APPLICANT NAME(print): 49638. APPLICANT TITLE: TW-79 <br /> Chevron Products Co✓ERIC MUNNS Chevron Retail HESSpecialist <br /> (Arend-My) Thb Pormhu been revknal ava: Approval LJ Approeal wM CoaMtlom Dbappreval❑ <br /> Loral Agenry Slgnatu : Date: <br /> Ca...1 ors,.1ACo.c11iU : <br />