Laserfiche WebLink
SWRCB; January 2002 40 a Page 2 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />Other (Spec) <br />Industry Standard Professional Engineer <br />Test Method Used: <br />Pressure <br />Other (Specify) <br />❑ <br />Vacuum Hydrostatic <br />Test Equipment Used: <br />Spill Box # 1 Spill Box # 2 <br />Equipment Resolution: <br />Spill Box # 3 <br />Spill Box # <br />Bucket Diameter: <br />10x11 <br />10x11 <br />10x11 <br />Bucket Depth: <br />12 <br />12 <br />12 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5MIN <br />5MIN <br />5MIN <br />Test Start Time: <br />1 1045 <br />1045 <br />1045 <br />Lutial Reading (Rt ): <br />6 <br />6 <br />6 <br />Test End Time: <br />1145 <br />1145 <br />1145 <br />Final Reading (RF ): <br />6 <br />6 <br />6 <br />Test Duration: <br />1HR <br />1HR <br />1HR <br />Change in Reading (R F - Rt) <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Pass 1:1 Fail <br />Pass <br />1:1 <br />Fail <br />Pass <br />E] <br />Fail <br />Pass <br />fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />