... ........... . -------- 1 77' 4 43 7 a 9 14 15'' 2 Suction Systern Open check a�ve, pull po )et and drain product from i'me into tank, ALIERNATIVE BACKFH-L MATERXS� Defined as any materiol not meeting above requirement SPrAL Fl-TTINGS: The shut-off v o N ol product pump 01 GENERAL RE',QUIREMENTS Do not reploce poppet, leinstall cover on volve, for approved or disperrier is secured �n po.siflon M box o I de 06d'' on the drowings, Pres,,5ure System- "Brock" pipo (it union at rernote purnp. Drain product into tank or Approva� of Compony Representotive is required prior to use of such moteripl, In certqiri, if ,itcted separately in each separnte conta�ner, inst,ances, the opprovol of the tank r-nonufacturer moy be required to pr�leve the tank w6rrahty,� Pos'itlon the so that the line test po"irt pflq M These General Requirements appiy to 0 sectlons of the specifirations as n, I U I , 11 section. Company sholl obto�n such opprr,,)vo�, Avoid s0ls, Do not ollow product to dra�n into soil. Contractor m,ay be held fiabie if soil PW WRAPP�% All r�nder,qround steel pipe pr rn ed an,4 wropped,
<br />COMPANY REPRESENTATIVE� 'rho Regional Manager or Representotive outho6zed by him, contamination occurs dur�no tank and �ine removol, Afternate moterials, if used, r-nust be dry ond free of ice an,(J snow, The tonk hole side',s ji1v sit -hall I jcolyeth�fe�e, tpe, I kori, 9' 0 monufactri: d' b tfi WropWng material b be ro'l re, e KendWl hA be- o hereinofter referred to in these spe6flc<Wons' (is Company Representatie, shored or ,�ide sloped to permit entry for cornpaction ind testing, Company (or equol approved ,Company' Repres66tatl�e),<" qlly�erlci n half wislth '(flh9s with PotykO0-000 6-603' FWsh W1 product, vent and vapor return lines bock in tonk or seporote container($) (Hushing of wrsipping moterial, Wroo, 1 o n(j 2' fl 2$ te, containers can be durnped �nto product tanks for storage,) Fiush each i�ne with o difficult areris Polylkeh 931 can e vs 04 rhe in separo overtop In before wra'pl 9 W1 I PoOo 100, 1, ri r BEDDING OF TANKS: A 12" min;rnurn bed of b(ackflll is to e piaced in, the hoW 0 Potyken 927 (abov 4 q, F) air,Pi�fykpn 919, (a Lwv e 1 STATUS OF COMPANY'S REPRESENTA riVE: Company Representofive has authority to make Mairy�urn of 10 g0ons of water. b, all decisions re(;ord�nq work performed uner this contract, srnoothed and sloped to ailow o took s�ope of I" in 10' downword toward 06 fill e6d P'nor o Open all openings and 'flush �nside of each tonk with o rninirnum of 200 gollons of woter using sett�ng the tank. En'epfiqns� Do not wra'p thd unicin' ot the rernote punip and/or FRP pi'pe/flex connector high pressure spray equipment with wond to %cish down" the sides ond bottom of the tank, Connections., IWORK INCLUOM AH labor, moteriol, utilities and equ�prnet required for full performance ond When specified, the hoid or Ue--,down shall be instolled prior to be bed m6teriol. cornp�etion of ork herein �specified or hown on Qccornpar)yllig drowings, including procumment Cornpony Representative will arrarige for a vacuum truck to coli,Tct oll recovered prodLlCt (�iquid SETTING & BEDOING PIM A minimum bed of backfill rnotodbl,, equal o 2 1/2 timos the pipe dia 'meter, of and payment for oil necessary perrnits, ifilifles, etc, unless otherMse Inoted on the lc�ons or and sludqe), Vacuum truck is to return "recovere(f product to 51op' at Company facility or Caution - Do not place tonks on concrete timbers, beorns, crod�es or orout the tahks in wei is to be ploced 41 0 &jn� troinches, Smo'oth, compact''ood slboe`�beddiriq m0,;ricil specification or specified by Company Representative, approed treating fa6Qy with approved o0/,Yoter separator systern, cement, The tank, whether tied down or not, nii,,�st never be �Oft on the bed without o br�ickffll to ollow a slope of I A4 pr foot toword the tank$, to the top of the tonk if there �s or%y cheance of woter, 12" or, more obove the tonk b'otto j In the 1/8 " per foot may 6e' Qsed if Ne, M p1jny, 0 The tank must be free frorn flammoWe vapors prior to rer-novol, One method is to rernove 0 DOCUMENTS: Drowings and specificotions are cooperative, Execute work indicated in One 0S if tonk fixtures, excopt for the tank vent and pkicle solid corbon diox�de (dry ice) in the tank, A SEE SECTION 07 FOR BACKFILL MATOIALS, indicated in both, Work riot det0ed or specfled must be some quality and type os work detailed mmirnurn of 1,5 lbs per 100 gallons of tonk copacity must be added Plug 011 tank openings -ninwniz poin I 0 1P or specified, Contractor shall verify 'ali d�mensions and conditions on the sito� Report ot once except the vent and aHow the tonk to ent� Piping hall be ploced on propored, bed in -.,uch a mejoner oi to o ts at whlch- �n p' o may cross over another pipe� At points whero piping m6t cross over, Q mWmurn of 2 1/2" niu'�t ony discrepancies found between spec,�ficaflons and site conditions for odjustmont by 03 PRODLJC F� VERY PIPING sopkirote the pipes, Company Re resentotive before starting 'work. in question, Under no 6rcurnstances should work After tank venflng, the vopor space shoH be tested by placing the combu,stible gas indicator probe in vestion, ge storted it a d�screpan<,.3t is discovered ofter oword of Contract, Terms7 of controct into, the HI opening with the drop tube removed. Reading,s should be taken ot the �ottorn, When piping irs &ced on the' bed, proceed to "Flr,,�t T�sst` (bolow) prior, to bockflPinq treches� appily to fts wor'k, Contractor to ke(,,p a cornplete set of drawings Qnd specificcitions an d a ny nniddl� Ond Upper portions �J the tonk� 'The tank atmo-sphere miust be 207* or less of the �ower ertn etc,, sboH lted,, p ent supp�emental documents on the job ot ail times, When the word PRQV�DE iS LISed On flanwisbte limit prior to rernovol, Refer to the probe manufacturer's instructions for test�nq in MATEWAL,S� AH p�pes, fittings, roi,,)ping t be furn�shed and insto, CLEAN�NG SOLVENrS: Remove any occorriWatlon or o1ccidentol spill of pipe cloonling sorrents Oq drowings or in peciflc0ons, it shall be taken to meon 'Furnish ond low oxygen conditions, by the Contractor, Specific moterials in this specificntion and/or n plans will be the tonk immediotely with a clen cloth. After the piping is completed, inspect, the contairiment furnished by Cornpony, sump and other collection for p�pinq, cleaning Coiitr'octor will tie, responsibte for Prior to remova�, oil tonk opemnr,)s be plugged, One plug should have o 1/8:' vent hole ony domage to tonk resultng from an of ipe clesaning soNent, P K LAWS, CODES, ORD�NANCE,$ AND REGULATIONS: Laws, Ordinances ond Regulatos to prevent excessive pre -,sure buildup, "This ent hote must face upard at 011 tinies. AH pipe runs are to be of "fiberg�as p�pe crid s�zed in accordance with &nq� which opply to this work must be rigidly followed, Determine hand�inq of any Voriations REPAIR OF PIPING� Reploce any doma 11 piping irnmediotely, Ropoir of piping using fleid cut between pk)ns or, specifications and goveri)4iq ordinqnces, etc,, with Cornpwny Representative PW9 any corrosion caused ho�es usmil -ewed boiler pluos, Company Representative vill inspect F1ex connectors (ire �o be r�sed the vent r�ser bose and 6spenser bose p�p�ng connections� � sc�� half section of pipe is not acceptare, If' opproved by Cornpony Representative, repair (A,�ing before starting work, the removed tanks, then releose the Tanks for sNprnent, manufacturer upp�ied pipe fittings and procedures is acceptable� Repoired p�pe requires Above ground vent ds& is to 1,,,)e st(-,�,O ' pipe, cornp�ete tes6nq or retest usinq, procedures below. AH U1, Labels sh0 be rernoved cmd g�ven to the Company Representative, PRECAUTIONS: 1rotect adjoining property eoflhwork, trees, etc-, from darnage cnd B�ock iron pipe cind/or fittings be used w�th dlesO Do not use goivanized ppe or fttings SECONDARY CONTA�NMENT FlTTINGS:' rwo pieco, fittings ee(p.jire more adhesive than normol give proper written notice of propo,,ied work to jomino owriers, beH and spigot, joints, Two 7/16 " wrenches or a vcriaWe torclye impact YV'rench i3 requ�red tsi Repair arry damage to oj6ninq AH tonk must be propedy kibeied pr�or to tronsportotion from the ite� Transport and disjsoso� ith iesei f uel, properties caused by this opercoi,,,.�)n to satisf,oction of Cornpony Representotive, Protect cornpleted of the tanks and product lines must be done in with all stote and local regWations, tighten the Make sure adhesive Nis all gops between pipe erlds and fitflng s,�kets, work from domage untii occepted by Cornpany Represent,,ihve, 1, FIBERGLASS PIPE� Pipe (and ' ;s, be UL approved for petroleum ond alcohol fuels, FoHow any state or loca� requiot;ons regard�ng soil sornples or inspection of tank hole ond/or metallic, for undenground piping (,J petrolet,n-n products, Ail pipe wM have bell and spigot' jointi. FLEX CONNECTOR BOOM Encase all flex connectors when in contact with soil in an iso�Qtion tanks, All product piping' wilt hove contoininent, Vent and vapor recovery piping dQ not require, boot� Move the isolaUcin boot to inspect ond all primary pip4ig and flex Connector, MATERIAL To be new, purchased locolly if ond of ��rond herein specified. Brands and secondary contoinryient urfless �,,�pecifled elsewhere, rades specified are approved nd mckided to estoWish t�"pe and quality requirements, If When free product is found during any phose of the removal of undergfound tonk(s) or, piping TESTING OF PIPING� Notify the Compony Representative, ,oho MUST obsere all tests, at least Approved Fibergloss Pipe� ontrattor wQuId prefer to substitute brands ond grade,s hot ore equol to those spe6fled, system(s), lrnrnediote�y ficifify the Cornpany Representot�ve, 24 hiaur� in advOnce of any te�ts, Contractor to coordinote testing W0 local �nspectors and informotion or) proposed substitutions must be subrriitted to Cornpony Representative pr�or to Compony Representatwe, procurement to determine'ncceptability to Cornpony, EXCAVATION& Excovate only to the depths requ�red by the p�ans, or os instructed Icy Compny Arneron RepresentaUve, Duoloy -- 3000/L P�pe Systern The Contractor is responsNe for all k,ibor, rnaferiW, nd ev,juipment to conduct pressure tests (01ir rr' Smith F'b,, I , � n c, or' hydrostotic) of oll product, vent nd vapor recovery piping, SUPERVIMN AND COOROINAT1019, Generai Contrastor is responsible for progreis, execut�on If unepected woter condWion or roc,k is encountered, i ime.&otely coritact the Company erj os" ind is to coordhiat and expedite procurement of rnater"inis Representative for �ntrijctions befona, proceeding with the e�cqafl6n, Red ad and qvality of Subcontractor's work Thre Pipe SY�Aem DEVIATIONS� Do not deviate frorn the f0oyvinq testing procodures, PerfQrf-n alternate ond performance of VVorrk of respective trades o6d Su�cQntractors, Geheroll Contractor to hove Iestin procedures required by locol lnspector�� ofter Cheron tests ore completed ond ��ow 24 m�ri;rnurn between Adhesives for Prm tho same qudfified respoosVe representative who'undor,5tands and spe0s Enq�ish fluently on the TANK HOLL SW IN STAOLE SCl1L: Size excovation perimeter to 01 ary Product F)iping Adhesves for Vent, Vap,6r, �)nd Secondary 'Cor1t6J)ii14rit�:'PlP1r1q docuryiented, j0 at alf, fli-nes, Urne of fingl irtspecti<)n� General Contract,er is �espo�-�s�We for tonks chd 24�' rn'nirnum between tank s�des and end cap's o�d the wall, of the tok ho�e, DIS -8014 (Must be Heat Packed) I ARST TEST (Pr,iQr to Nr' Ploe' ribt cqnnect pipi o3toW,�shin and, mointaining all levois amd grades shown on plom3 or atherwise required, 9 to ank.�, remote 'General &ntrqctor to rnointain site in accessiWe eonditiori for other trodes,,ond contractors, pump or -Do not s 1 c 0
<br />iM y p, ping in W1 n fdJ n rn P. h t fitting until pi I the pipe being used", TANK IN UN$TAOLE *np 7, 1�sj Non-rretalh(� fittings gre to be those, rnonufoctu'ed by the supplier '0 staWo ooil is defi d� ds hrrvinq,,less� than % sq, ft. "cdhecion, ds toted f rrn unc,Oeifii�pd �6rrp�Ossion test, pe 6h with dn ultih)ote bring )09; peo vi,arnp, rrr here o,li "'d'f tf' a �,�rdon�6 with the on'kAdctueer I ins ru� h respon*ibifity for p ns si (risto primory, cod' :on Ing$ it) C H ,roper horldling and i W �y p p -r�lro pioln� syiten�, pedd��4 M ery RESPONSIBIL,iTY., The Controctor occepts fuH t Haflon� pacif of 4qwo� m0ck 11 ondfill S S t e nd vo iory <1 00r, roco, of the fiberglass r'�Wor 'Re undergound tonks and FRPi,piping, and i soft ore genercHy consWered s d c �FRP) or cornpos mized or Black shrill enswe that', good woZnanship, proctices, 6nd 6nstfu( ion procedures are fo owed during 2, STEEL PIPE: (Gq�vr Itho hand6nj and Instaliation of the tanks ond Piping, Size excovation pe6meter to 0ow 2,V' rnirlifflUrr) �etween tonks and a fninimurn of holf the tank dkimeter betwe�%n the tonk side�i/eod, cops ond the waV of the took hole, Scheduie 40 (ASTM, A- 1 20) Pipe flo atep Ohe:: 16stoll 'prOs'sure Opp isa n sys(errr thot �wo pressure �qvqe� (1,5 300 Railroad Umons The Contrartr is respon5,�ble for imspection of the tanks for damc�)e upon rece�pt at the job site� ir 16 jssi,into tiie p009 y$te'rni t$bte, darnage on the delivery receipt, Filter fabric will be used to Hne tonk ho�e for FRP tan NQt a ny' vi ks in unstaWe s6t. 150 Malleoble Iron F;ttinos OOP a n S U Ing,, all ,eci�dd s6a solwfion", e '0i t', s 9s'erve each joint f 0, I 'e rice 'of Ieoks, r Vide typ�roHy furn�shed w�th U p1pe, The presence of the Company Representative on-s�ke doess not re�ieve the Contractor of the Permonent shoring rnoy be use tQ stobii�ze the xoils of the hofe,.nt the dscretion of tho Do not use standord coup��nqi 10 Contract,Qr sind/or Compan "Stable SoW respons�bility for proper tank hon6riq, instolkiflon, and safety measures, Repres;entaflve, It permnent shoring ls used, follow t e p -rwo� Protect riroa, ar6q6d oipiriq systems to prevent vyorkmeri,, possers-by, e �c, ize criteria, Refer to Elackfill Wateriols,* below, HANDLING OF PIPE & FITTINGS� All piping �nstallat�on-i shaH conforfn to p;po mQnufacturer's from entry, Install pressnrd' Op lot �ncfudes two pressure S p��cation specifications and instailakni guideknes, psi maximum) Apply ipirig' syster�n, h0d for o, ri'o, r'ninute, 100 pst 'pressure to each pi TESTING AND MPECTION: he nature and type of tests and/or inipections to be conducted, �n re�eoso pressure, Repeat" Ne fivo cycles, addition to those speciflcoHy coHed for on the ptans or in the specificntions, will be 1�sted by DEPTH OF UNK HOLE� Contractor is responsib�e for ertaWishing the tank hole depth, considenn9 1. FIBERGLSS PIPE� CQrefiJ handiing of is criticof, Protect piping agoinst obrosicin, from sharp or hord objects; impact da'mooe from 4rproper storage tronsporting, �ayinq or of pipng 0 the purnp and vent r1sef's, pipe burV depth, yord slope and Compony Re�reserito6ve under "Scope of Work," The cost of tests, w6H be paid by the the �enqtri ?I �tep Three: Repent ',Step On 0', c6rnpany� the following criteria, (Me'osure at the Remote f-'urnp opening). bockfilling, Inspect 011 Pipe for darnage '�rrior to installation in 41'e" piping sys'torn, Record all , test results, on the CQmpany-supplied f or als Company RepreOntative's, cipproval of -rINGS� Protect aqo�nst darnage to protective coating/wrappng. test is require I d, After obtoining o pprovol, the backfl 11 trenches to If the Company Representotive determ4ies, during the course of construction, that Qddltiomo� 1, A minimum of 12" of' �ackflH rnaterio� is required under the tanks, 2, STEEL P0E AND AT Inspections or teiting, whether b� Company Rep(esentative or o testing agericy, are necessary, subgrade, followim) the requirernent� of $060rl 02 ond, moteriois in Sectioh 07, in has 2, FRP The rninirnurn depth of cover is X-0' and the moximurn INSTALLATION Rf',Q�AREMENTS: �nterior ��,urfnce of ll pipe ond fittings must be free from dirt, the Contractor shoH coor,>erote n making arrongements for such if work not et been installed and material �s satisfoctory, payrnent for the tet 00 be rylode Composite; The minirrinryi depth of cover �s and the maxii-num is sco�e, metol, fiberglass parQl(,%,s, etc, before connecting, 2, SECOND TESr (After eoling secls,ndde� piping): Apply 10 psi to the secondary containment 'note at b pony, If fhe r H is qnsotisfactory it shall be rep�aced at no additional cost to so olOons, �y & sy3tem, Soop oil joints using o0o op S Produlct pip4-ig rinust be pitched upword frorn tonks to ris6rs o minlrourn of 1/4�*' per (OrT,Ipany, and the cost of the test shaH be paid by Contractor, 3, Pitch the product I*nes 1/4" foot frorn the purnliblocks toward the tonks, foot, Traps or scigs will not be PerrriMed, Group oil piping arid locate os shown on the plans, 3, THRD TEST (After connecting pipin� to A 'k 45 ii '�rosuie PP y P1 For work o1ready inst(Ped (which must be uncovered in order to be tested), if lt is defective, the 4, Pitch the vent and'vopor return 6nes 1/4 per foo toward the tonks, Lines are to be Vd traight, using for &rectiorro�' and elevation chonges, si) to test system,' K�Ae' on oll li6es n6fif �or 'plqte�j, p n Contr,octor sholl bear the oxpense of such uncoverino, tesOnq, lwspect�on ond replacernent of There shoWd be no pressure �oss Oun'�O' th rernoindr of the defec6vp, m6teriall or construction, lf the work is not found, defective, Contractor wM be allowed 5, Minimum of 1/2 inch separation between fittings & pipe, w0 exterior for 0 A pip�ng with foreign such as scrqps of wood, pipe, that rnoy darnage -ne, or both, directly - overs, Minimum 6 1/2 inch separot' ",s,r (After ElockflHin!j ond Potch, lco�nq)� App0e$ to, peoduct 0nes rj an increase in tke controct price or on extension of the contract 6; fiberqIoss p�ping ot cross Do not suppof 4� FOURTH r�, after to S, h uncoved piping, Use foorri support, attributoWe uc ng, testing, etc. botwien fiberq�ass p�p�nq in the trench, and the., wal�s of the trench, and potching 0 concrete islands, slobs, and yord,paing is� com leted. p ir, of piping runs nd br,ickfM of pipe trenches, refer to Section 02'qr)d to subsequen't Te5k knes tiling Petro Tite Hydrostotic Line Testinq equ'ipryient or opproved equaL CrnrpO' y perforrn the work in accordance with safe practices, taking 0 rea$onrlble SAFETY REOUIREMENT� No person shaH enter a tank ho�e excaation be�ow the 5 ft, deep �evol portions ofgf.,Ws section, r SAFETY: Contractor shaH Repre�entatie to des� note telst1fluld, Test fluid "sholl be siss , uAd Oroduct, dieset'' fuel 0, �y current 05HA regWations such as ,autions to protect the Facility ind adjacent foci0ties, orkmen and the pubiic arid providing, uWess the, wolls (,,ire sHored or the sides s�oped os �y Wiy with the Pr<,,,cedure Manua fior he 3peration of Line tester, prec I Contractor to comp t CFR 19M650, 651, xcept�ons, State or tocW requirements CUTflNG QF PIPE� ,rr NQ e where reaonably necessory, borne o, guards, ternporory bridges, Hqhts ond watchmen, Whi�o on and 64, the prermse f Company of its offiliotes all of Company's safely ruies holl be strictly observed� thot are more thon Cornpay ore to be ddhered to cis thouqh specifled in $ 0 Test presvre shall be 50 psi (mox,), 11.5 tir-ne,% operating pressure (150%)� for o remote pump, in or,GcWor, smokino shall be limited to such �ocations and occosions os ore spec4icoll Cornpany specifiations, The Contractor �s responsVe for ony d�siqn, rnoter�als, equipment, permit,$, 1, FILIERGLASS PiPE; Cut with a fine-toothed hacksow blode or an abrosie 'wheel bn a t of QM0 gal/ P ystern with on oHowoWlo oferaoce hr, authorized in writing by Compogy, Controctor shail not perform or perrn4 ony act on tL etc,,, for shoring or side sloping a hole, circular power sow, (Ise a sow quide or "AfrOp Around" To enspre o square cut"end, Cut pipe end must be w�t i hin of Square, prernises of Company or its affiliates which involves a fire or exp�osion hozard, Vent �ines ( or recovery)� h c u , nd 6 welding, torc ttini a sposoi of debris by burning, ithout prior wrAten com,ent 6f FILL AND BACKF�LL,� All flH rnoterial sholl be of o granular nature, free frorn ve9etQfion and -�d or, power or power -operated pipe cutter, (is ir) normol fitting Un�ess requ�red by' �oca� dgency, no second test required, extroneQus materV, Company Repre,,*entative inspect a,nd apf,>roe tho moterial �efore it 2, STEEL PIP� Cut ith a ho� is spread, Spread moterial in not to excoed 12 mches and tornp thorougWy, When required practice, The controctor is responsible for, cerflfying that employees and subcontractors are trained and by loco� code, Genera� Contractor shol; provido'o compaction test for certificotion of fM,, Vent lines ond vapor recovery p1ping (with phose :M vopor recovery), o6ons ar)d Ernergency Response (HAZWOPER) �n accordance '5/4 d
<br />certified in- Hozordous Woste Oper rAPERING REAMING� Toper oil cut fiberglo,,ss pipe ends to I-, e9ree,s using one of the wlith 29 CM 1910,120, topering tools ovoilaWe from the pipe mohufacturer, Protect p1pe, during tapering to revent, v0por recovery piping systesms possing any loolly Contractor is, responsVe for vont and BAL,LAST� Use ater os bollost under 0 condiflons where bol�ost is requira,d, darrio96 to pipe, The finish toper shaH be smooth, cleon ond free from svrfdco de?ects, Th'e imposed test rpqWre'rnents, WARNING! Tets indicate that prol= ed or repeated exposure to petroleurn substances, �n liquid lenqt�' of toper for, 2" diameter pipe �s a�nd for �Y*-'diameter pipe ii I For other size or vopor form, moy be harm 4fer to Mote6cl Safety Doto Sheets fc),r specifle inforrnoUon pipe, �onsult p;pe nionufacturer's on vdri6us petroleum prducts, DRY HOLE CONDITION: Tanks, ith backfill to top of tonks, rnust be balkjs�ted ;f there �s ony chance that surface or subsurface water enter the tank ho�e to a deoth of 2s' of greater Steel &e ends are to be reorned, V) above the bottom of fl -ie tanks, DONDING ADHESIVE SYSTEMS (Hber�.4k)-�s P�pe): All p�pe surfaces t FoHow manufacturers precoutions for fibergr�oss p�pinq, resins, or s0vents used in assembling the is un0 bockfM is to top of tanks, be cleoned ith solvent by pfp(i If topered secti�n is wet or moistj piping system, Coution - Do not ballost tonk 17� dry with Oropane do not or burn' the pipe, If temperoture i be'(oW' V F C)� E warm ll topered su,rfaces prior to app��ing resin, or s#, epoxy odhesive as re c,6rhmended by t6q, WET' HOLE CONDfflOki� Atternpt to pump woter frorn the tank hoie to rna;n�t�j a Dry Hole manufacturer on 0 bell ond spigot joints, Mix adhosi've thoroughty in accordonde with R �7- 7777 77 'R 77 C> CondRion," If unabie to obtoin a "Dry t-Ve Condition," notify Cornpn I e0resentative who will rnanufocturer',s and app�y to both surfaces, ln5ert the sp t end into the belI using 02 EXCAVATION AND BACKFILL ie -down "I and �eddlnq as specified -holif to a turn is necessary) ari?do push. determine the course of action er fiabric,, t og sh( ht ty'rnin(j mofion (0�')e (SupWernent to ConstrucUon, Specification) eisewhere, Set tonk in partially flit vioter unt0 it inks firmly on the bed, t.1se oni�, ------- enough water to ballast tohk until bockf ill is to top of tonk, After, backfi0 to top of tank, fill App�y preture rintil fnechcniso� �ock is ochieved, Mointo�n track axV pressure, on 0 proylously tank with woter until completion of asseinWed joints to redi,,;ce the chonce of separation, 'MOVAL OF EXISTING TANKS AND PIPING SYSrEMS� ContrUtor W4 furnish permits, labor R� and proper equ�prnent, except cis noted, to remove exls6ng tanks and lines per the f0owir�g Caution Ballost �evel rnu,,,,t never exceed woter or backfill level in the hole during �nspect oH fittings for proper ahgnrnent and posNe "back -out" at the joints, MARK DATE!, procedure, Do not remove b0ast tank slab f�to been poured, Do not set remote pump rnotor uriCl from tank. Follo�! pipe rnanufacturer',,s on cure tirn4� before disturbing joirits,or, to,isting. $ is anticipated that the tern perob,tre wiH drois below 7(Y r (21' C) at, any ti�66 during the T baHQst water has,,been rernoved If it Contractor, a part of the contr,Qct, will execute ord comply with the Compony's "Addendum TANK, Tank Disposal Certification Agreement," curing procese, appiy heat to the oints, Only chemic9i or eiectrical deces recQmmer�ded by TANK HOLD-DOWNS lnstall h4J-down at all �,ocotiQns vith known water pipe manufacturer are acceptable 'this purpose, I)o not use open flome 'or �Spcirktnq devices, GENE Ail tanks and piping shall be rernoved and di -ro r) uch d propone torches, to cure rein, 0 isposed Qf in accordance with the Addendum Tank condiUons ond nt those �ocations wherp wator is foujid during tank Refer, to 4 Disposol Cer6flcotiori Agreement and applicable stote ond local regt.,ilctions, Hold -Down' drawing for design, fabhcation and instollotion roquirernents, and to Section 05 of (30 these 5pdc4ications' end drcW'Ing' F--10 (N-PET--F10--,50WG) THREADEC) JOINT$: 'rhreaded steei p�pe joints must be eeomed, ond have cleon 'perfect RQinovaf of tanks and lines shoH corripiy with API Recommended Pract�ce 1604, ReMOV01 ond threods and be made up w�th non-h(,,,rdening joint cornpound iosisluble in p4tryl�6m pro'ducts Disposal of Used Underground Storage Tonks - December 1987 and Morch 1969 supplernent, approyod by Compony Representative, U,,_Q H -[fflLADF L EMOTE TUMNE� Controctor to verify turbine heoO wili be 4--6' obove tank bottorn, Do not R Contractor shall also cornpiy with current NFPA ond loai requVions, install turbine if turbine shaft �ength exceeds tank diarneter plus buriol' deptW "rypicai joint corripound� Company Representafive is responsible for removal of Wi reusoWe product from the tanks, Notify Company Representotve, who wM determine the course of actin, if shaft exceeds tank tfl-PRO THREAD SEAtANT� REFER "rO A, 0, SNfl'Ri BULLE,firl No, 04,510, ic(oduct will be returned to terrninal or other company fa0ity� diar�eter ph)s bt�rial depth, Perf-riotex 51 -D Excovote to the top of each tank, Core must be taken to prevent, break�nq any piping orld or approed equol re�easinq product �n the environrnent, Prior to torting excavation, the contractor shall enSUre ch power is shut off to any (,�rcuit, whose conduit may, cross the excovation, Fl8ERGLASS TO SHEL PIPE OR FLEXIBLE CONNECTORS: Thread fibergloss adapters Into the teel pipe or before bonding,onto the fiberq�os,,s p�pe, U0 ensl, Norfl* Re''17, fibergloss f4Urig when conne6nq to flexible connecios., AII flexiWe corinectors OrO'l rh(if67-swivell femo�e, The ferric�e end conneacts to the flberq�ass pipiling, R 0- E DF NF T, 7 71 -� r A Z, T� -RIkV -RAX 0, 4 7� 7777 77
<br />
|