Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN—PAGE 2 <br /> BENEATH DISPENSERS)IS PERFORMED USING THE FOLLOW NSi METHOD(S)(Check all that apply) <br /> ano. <br /> MONITORING OF AREAS <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT Not. Mn. <br /> 1' 11 MODEL#: <br /> PANEL MANUFACTURER: [ �"LCr %M <br /> LEAK SENSOR MANUFACTURER: <br /> fAa L Mss. MODEL#(S)i � Mss. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? O a .❑ YES 0 b.NO NM. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? htn. <br /> WILL FAILURFIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)N UDC TRIPS SHEAR VALVE N CASE OF LEAK <br /> /a rir2 M» <br /> ASSEMBLY MANUFACTURER: Nato. <br /> MONITORING 3.VISUAL MONITORG DONE: ❑ a DAILY b.WEEKLY lawurts.sr�'>rma'�) <br /> ❑ 4.NO DISPENSERS Nate <br /> ❑ 99.OTHER(Specify) <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK <br /> M]a. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> Meo. <br /> I <br /> REFERENCE DOCUMENTS MANTAINED AT FACILITY(Check all that apply) <br /> 1. THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3, THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 7/12004) <br /> 4, ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> � <br /> 99.0 OTHER(Specify): <br /> Personnel withUST monitoring responsibilities are familiar with all of the above documents relevant to administered <br /> duties and can access Kase documents when needed. <br /> By July 1,2004,this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By July <br /> 1 2004,and annually thereafter,the "Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST rysttrns.This <br /> training will include,but is not limited to,the Following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management pmcticw <br /> D The facility employee's role with regard In the leak detection equipment. <br /> • The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alamat. <br /> For facility employees hired on or after July 1,2004,the initial training will be conducted within 30 days of the date of hire. <br /> your local a envy'): Nm <br /> Plcase use this tion to6 include any additional UST sYQ m mon ring-related information(e.g.,ax additional tion fired bye' 8 - <br /> ION <br /> -F :i PERMIT <br /> LICA <br /> FAS OF 7/l/20041 THEACILITY FORM WILL HAVE UL IMATE AUTHORITY OTD UST—OPERATOR- R PERFORMING THE MONITORING ACTIVITIES ANMAINTAINING <br /> I IED IN SECTION 11101 L NJ LF.AKPDETETCT ON <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715 6. <br /> CERTIFICATION:I card that the information pmvlded herein is true and accurate to the best otm knowled e. `rot <br /> DATE: <br /> OWNER/OPERATOR SIGNATURE _ O[vner M90 / <br /> ❑0 o <br /> `�._. Imo— awzNroa. <br /> OWNER/O TOR ITLE: <br /> OWNE ERATO NAME(print):1/4 , <br /> V d <br /> (A Cy Use Only) This p has been reviewed and: Approved ❑Approved With Conditions ❑Disapproved <br /> Date: 4ra <br /> Local Agency Signature: .(µ f,9WComments/Special Conditions. + s� <br /> � mn3ro3 <br /> SJCEHD-d(07/03)-314 <br />