My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO 1985 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:11 PM
Creation date
11/7/2018 4:56:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2001
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\3440\PR0231173\COMPLIANCE INFO 1985 - 2001.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/13i2001 0'759 s' FIn aFAVO Rllcx. F„GE 0E <br /> 04/:e;2d81 <br /> 1.a: '15 520 ?y4 vr1 <br /> in addition, to the submersible pump problems encountered without an in-line check valve, <br /> the metering portion of the leak detector is hammered by hydraulic shock, This results in <br /> many leaks going undetected- Those leak detectors are just not equiped for the job you <br /> purchased them for. <br /> The 99 LD-2000 is the answer you have been looking for. VMI leak detectors, with an inte- <br /> grated check valve and pressure relief valve will save money and reduce customer frustra- <br /> tion at the dispenser and reduce service calls. <br /> The 99 LD-2000 <br /> Has A Higher Level Of Performance Over A broader Range of Burial Depth, Line Length, <br /> And Piping System Types Than Any Other Leak Detector <br /> Additional Features <br /> • Over 20% increased flow capacity <br /> • Guaranteed for 24 months from date of installation to detect 3 GPH @10 PSI leak <br /> • One Way Poppet flow path <br /> • Reverse Ratio Piston ! Poppet combination <br /> • Smaller Volume - Faster Response piston size <br /> • Shortest profile leak detector available for "tight" inStaltations <br /> • All fuels ( gasoline - diesel - alcohol ) to 400 ml. resiliency <br /> • All pipelines (flexible - fiberglass - steel) up <br /> • Exceeds EPA regulations (3 GPH Lz 10 PSI) <br /> • Detects leaks up to 10' above the leak detector <br /> • Installs with 2 1116" six paint socket or pipe wrench <br /> increased Flow Capacity <br /> • The 99 LD-2000 has maximized the flow and flow path in existing, older submersible pump <br /> heads, This new design allows over 20% more flow than previous LD -2000 models, maximiz- <br /> ing pump performance for earlier pump heads, <br /> Longest Guarantee with all other <br /> • The 99 LD-2000 shares the longest guarantee available in the industry, along <br /> VMI 99 LD-2000 series teak detectors. For 24 months from date of installation, the LD-2000 is <br /> guaranteed to see 3 GPH G 10 PSI leak <br /> "One Way" Poppet Flow Path <br /> • The "One Way" Poppet Flow Path isolates pump turbulence frcm line leak detection at <br /> pump startup. The hardened stainless steel poppet does not dimensionally change because <br /> of thermal conditions encountered during station operation (precision metering change is <br /> insignificant down to -20° F). <br /> "Patent application in profess <br />
The URL can be used to link to this page
Your browser does not support the video tag.