My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 7 Dry fitting secondary containing short runs <br /> containment systems For primary runs under four feet in length,a standard 14-inch containment <br /> (cont.) and short pipe nipples can be substituted for 31/,inch containment piping. <br /> ' L<4n IN <br /> w it <br /> IFig.7-10.Contain short runs with a — — — <br /> I standard containment coupling and ' <br /> short containment pipe nipples. <br /> ' Containing crossovers and very short runs <br /> ' Make crossovers by using 45°elbows and tees in both primary and contai <br /> this way a minimum 4-inch vertical clearance can be provided between th <br /> the length of c <br /> nipples at cro: <br /> I a Containmentry <br /> other She <br /> 45°elbow D+1 /x <br /> face-to-face c <br /> L ° ° between the s <br /> fittings plus 1' <br /> Fig.7-11. At crossovers and very short ° D order to allow <br /> In runs where even a containment half- space to mov, <br /> coupling cannot be included,cut the 4 ° containment) <br /> containment pipe so that aminimum <br /> min <br /> 3/cinch insertion depth in the working on th <br /> containment fittings is maintained. O This length wi <br /> insertion dept <br /> pipe in the coi <br /> Containmenttee fittings. <br /> Centralizers <br /> Centralizers are not required in Dualoy 3000/1-containment systems unlet <br /> detection lines have been specified by the owner.In such cases,contact <br /> availability. <br /> Take care not to allow stones and backfill to enter the annular space betw <br /> and containment as this may result in leaks. <br /> S <br />
The URL can be used to link to this page
Your browser does not support the video tag.