My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Dryfittingsecondary vent piping <br /> containment systems Do not use fiberglass pipe to 0 <br /> (cont.) <br /> support the weight of heavy items in Permanent <br /> a line such as valves,strainers and structure <br /> steel riser pipes.When containing <br /> ' vent piping,do not use fiberglass Steel pipe clamp(typ) <br /> vent or containment piping to <br /> IFig.7-12.Support risers by attaching support the steel riser pipes:the <br /> I them directly to structure walls. weight of the steel risers may <br /> prevent good bonds in the fiberglass Steel riser <br /> ' lines and result in leaks.Support the <br /> risers by attaching them directly to <br /> ' structure Walls. Dualoy 3000/L fiberglass pipe <br /> I Q Bonding containment Adhesives for containment piping <br /> ' Q piping Two different amine-cured epoxy-resin adhesives are used to install Amero <br /> I ment piping.Ameron B20 adhesive is used for 3,3'k,4 and 6-inch containrr <br /> Apply a heavy and fittings.RP34C is used for 6-inch systems using older fittings. <br /> I ° layerorbead Bonding and testing contained primary piping <br /> of adhesive to g <br /> ` ° shaded areas Bond the primary only after the containment pipe has been placed ov <br /> o adjustments have been made for clearance and interference. <br /> ° • Follow standard adhesive procedures.Do not disturb the primary line <br /> Install inside the adhesive cures. <br /> jfl nvetsornuts <br /> and bolts first 0 Primary system bonds must be visually inspected or soap tested befc <br /> containment fittings. <br /> 0 0� <br /> Sealing containment piping <br /> Holes on some Bond containment only after primary lines have been tested and insp <br /> oldercontainment <br /> may <br /> need t • All bond surfaces must be free from water,soap,oil,grease,dirt a <br /> 0 0 o fittings may need to 9 P. <br /> be enlarged using a and should be lightly sanded before applying adhesive. <br /> 1l�drill bit before <br /> inserting rivets Take care that each leg of the containment pipe goes into the fitting s <br /> Fig.8-1. Containment fittings seat is not disturbed until the adhesive has cured. <br /> effectively onlyifthe shadedareas Assembly of 3,3/2,4 and 6-inch containment <br /> between the holes in the flanges and the <br /> inside are well covered with adhesive. • Apply a uniform,heavy coating or heavy bead of adhesive to the in <br /> Adhesive applied to the outerhalfof containment fittings flanges(Fig.8-1),to the sanded radius of the fitti <br /> containment fitting flanges will serve no <br /> purpose unless the holes themselves are the pipe will fit,and to the outside of the containment pipe.Apply adl <br /> sealed.For this reason,and to conserve both half-shells. <br /> adhesive,itsuHices toapplyadhesive <br /> onlyto the innerhalfofthe flanges. Put the containment fitting around the containment pipe carefully.M, <br /> pipe is not cocked or misaligned in the fitting. <br /> • The recommended method of joining 3,3'k and 4-inch Dualoy conta: <br /> fittings is by means of rivets.Rivetted closure is cleaner,more effecti <br /> r-------------, much faster than closure with nuts and bolts.The compressed air-dr <br /> I The sole purpose of rivets and bolts is I Ameron Rivetool and appropriately sized rivets are available from An <br /> to hold containment fitting halves from your Ameron distributor.Use wing nuts or conventional bolts <br /> The <br /> rf mane he adhesive and cures.ed <br /> 6.inch containment fittings. <br /> The performance of joined and cured <br /> Ameron fiberglass pipe systems i • Insert a rivet into each of the holes in the fitting. <br /> ' depends in no way on rivets,bolts or j Keep the upper stem of the rivet clean to avoid the accumulation of a <br /> j any other metallic closure devices. ' the end of the Rivetool. <br /> Moreover,the UUULC listing for r <br /> Dualoy 3000/L secondary • After inserting the rivets,hold the two fitting halves Follow all instr <br /> containment piping is the result of togetherfirmly with three orfour C-clamps.It is safety prec <br /> tests conducted after the adhesive always best to insert the rivets before applying the I provided with t <br /> has cured and all rivets and bolts I clamps as the rivets serve to line up the holes. <br /> L_— have bee-re--ved___J Attempting to rivet containment fittings without using C-clamps <br /> in substandard joints. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.