My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1, Three complete sets Ens (include manufacturer's specification 0a for proposed equipment to be installe, <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show Location of tanks and all associated piping. <br /> - 4: Striker plates ordrop tube-mounted bottom protectors illustrated below aLL accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6; Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter It <br /> Article 3, Section 2631 (b) & 26351 <br /> B, verification of product,compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written instatlation instructions for tank(s), piping, monitoring devices, etc. <br /> ip. At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (2°)containment systems before covering. [Section 2635 (a) (3) 3 (01 <br /> Tank integrity test required upon completion of installation with tank in operating condition. Test results to <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 2 <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # # /T # # # <br /> CAPACITY ��- i• <br /> MANUFACTURER I&Y 2. r <br /> COMPOSITION `ribeY 'b> <br /> MODEL t,'6f1e L L <br /> PRODUCT e . l-L supeaL <br /> CORROSION PROTECTION <br /> U.L. LISTED L' <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> -� A. Steet-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> _ B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installati L� <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> N4-A C- Non-clad steel tank [Section 2635 (a) (2) (A)] <br /> _ (1) . Cathodic protection provided for entire tank, piping and components (nuts, bolts, washer <br /> etc.). <br /> _ (2). Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3') Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.