My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STOKLEY CONSTRUC �. ED <br /> , <br /> P.O. Box 1008 �' -' <br /> Tracy, CA 95376-1008 NOV 2 0 1998 <br /> Lic. A,B, & Haz. CERF. 492743 <br /> November 20, 1998 PEpMi i I = <br /> Ms. L. T. Briggs, <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Ave. Third Floor <br /> Stockton, CA 95202 <br /> Re: Jamar Service, 4075 E. Main, Stockton, CA <br /> Tank Removal and Tank Install <br /> Dear Ms. Briggs, <br /> In Response to your fax of Monday November 16, 1998: <br /> Answers to your questions: <br /> 1. See attached drawing. <br /> 2. See attached drawing. <br /> 3. See attached, piping fall shown on drawings. <br /> 4. See attached drawing. <br /> 5. All pipe fittings will be compatible. <br /> 6. All monitoring equipment and sensors will be compatible. <br /> 7. We will be using Ameron Fiberglass piping for product lines, secondary lines, vents <br /> and vapor recovery. <br /> 8. See attached. <br /> 9. See attached. <br /> 10. UL fuel piping will be used. <br /> 11. See attached drawing, page two of original drawing. <br /> 12. Additional submerged empty tank stability Calc. <br /> 13. Additional information on Bravo boxes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.