My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection, handling Do not drop the pipe from truck bed when stringing:Lay the pipe down byhar <br /> 1 and storage(cont.) Pipe loads that are properly separated and supported can be unloaded by <br /> padded forklifts. <br /> Storage <br /> rDualoy 3000/1-pipe incorporates a 5-mil thick,resin-rich reinforced outer coating <br /> which provides outstanding UV resistance.Pipe stored out-of-doors for extended <br /> Iperiods may assume a chalky appearance.However,this change in appearance is <br /> superficial and does not affect the pipe's performance.Protect stored pipe from <br /> I impact damage by stacking on padded racks. <br /> I A Materials Pipe <br /> Manufacturer tallies pipe on the basis of overall length. Allow for cutting losses and <br /> I wastage when ordering. <br /> IFittings <br /> Primary pipe fittings are sold in the following boxed quantities. <br /> I <br /> ' <br /> Nominal Primary Fittings per Shipping Box <br /> Pipe Size 900 45° Sleeve <br /> ' (in)(mm) Elbows Elbows Tees Couplings Adapters Nipples Bushinc <br /> 2 50 10 10 10 15 15 15 15 <br /> ` 3 80 5 5 5 10 5 10 10 <br /> Adhesive <br /> Ameron B20 adhesive is an amine-cured epoxy-resin adhesive designed to make <br /> permanent bonds in 2 through 6-inch primary systems carrying petroleum or alcohol <br /> based fuels.It is supplied as a two-part system consisting of a resin and a hardener. <br /> Each adhesive kit contains <br /> Refer to the layout drawings to estimate the number of adhesive kits required.Include <br /> • Resin • Detailed usage instructions <br /> • Hardener • Emery paper <br /> • Mixing stick • Gloves <br /> • Spatula and/or brush • Paper towels <br /> bonds for all fittings,elbows,tees,reducers,adapters and couplings plus a waste <br /> factor.Short pot life at higher temperatures may not allow as many bonds to be mad( <br /> as indicated in the table:allow a greater waste factor at higher temperatures.For <br /> further information refer to the adhesive product data sheet. <br /> Primary Bonds per Kitt <br /> Nominal Adhesive Kit Size Cartridge <br /> Pipe Size (oz) Dispenser <br /> (in) (mm) 1.0 52 8 zs 50 ml <br /> 2 50 2 12 — 7 <br /> 3 80 1 8 14 5 <br /> 4 100 1 6 9 3 <br /> 6 150 — 2 4 2 <br /> 1 The average number of primary system bonds obtainable by an experienced crew at <br /> 75°F. <br /> 2 Available in six-pak kits. <br /> 3 Excessive waste may result when using the 6-oz kit to make 2-inch bonds. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.