My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> _ 7Bonding primary The table indicates the adhesive pot life under various temperature conditions.1, <br /> systems(cont.) weather,pot life maybe extended by wrapping a damp rag around the can of mr <br /> adhesive or by spreading the adhesive on aluminum foil to dissipate the heat. <br /> Pot life/cure times for Ameron B20 adhesive <br /> • Minimum Ambient Adhesive Minimum Joint <br /> Temperature Pot Life Cure Time` <br /> (°F) (°C) (minutes) (hours) <br /> 40 5 70 12 <br /> 65 18 40 5 <br /> 75 24 30 4 <br /> 95 35 20 3 <br /> Cumulative totals.Cure time at listed temperatures need not be <br /> uninterrupted,but total time must equal the tabulated time before <br /> the system is pressure tested. <br /> Force curing adhesive <br /> r 1 At temperatures below 40°F(5°C)or if the temperature will not be above 40°F(5' <br /> Temperatures may be lower I during the entire period of cure,an external heat source must be used to force c <br /> 1 than ambient in a trench or I adhesive.The adhesive and the bonding surfaces should be warmed to 50°F(1( <br /> out of direct sunlight. I before mixing and applying the adhesive. <br /> Below 40°F(5°C)force cure the adhesive with an external heat source such as: <br /> • Chem Cure Pak(US Pat.No.3,475,239) <br /> • Ameron heating blanket sufficiently large to cover the joint <br /> • Forced air heater if the trench is covered to contain the heat <br /> L <br /> • Hot air gun <br /> Using Chem Cure Pak with Ameron B20 adhesive <br /> The Chem Cure Pak is a self-contained,nonelectrical heat source for curing adh <br /> In bonded joints.Instructions are printed on the Pak wrapper.The Pak is designed <br /> sufficient heat is generated to cure Ameron B20 adhesive in one hour at ambien <br /> temperatures as low as 0°F(-18°C).The Chem Cure Pak is manufactured in diff( <br /> sizes corresponding to the diameter of the piping being installed.Use the conec <br /> Pak for your installation.Refer to table on page 11 when ordering. <br /> In cold weather,wrap insulation around the Pak as soon as it has stopped stean <br /> For lower temperatures or when installing extra-heavy fittings,consult Ameron f <br /> r-------------I specific recommendations. <br /> Chem Cure Pak contains oxalic I • Assemble pipe and fittings using standard field installation procedures. <br /> acid.Harmful if swallowed.Causes I . Mix the chemicals thoroughly as directed on the Pak wrapper. <br /> skin and eye irritation. I Wrap the Pak around the connections,centering it over the tapered sectic <br /> L____________J the joint,not over the end of the fitting.Cover the entire bonding area to w <br /> adhesive has been applied.Refer to Fig.7-1. <br /> • Use one Pak per bond:sleeve couplings in 3-inch sizes and larger require <br /> Activator Paks.However,a single Pak is sufficient for curing both bonds in a 2-inch <br /> 1-in slot syringe Coupling. <br /> • Secure the Pak with tie wires. <br /> • Cut slits at least 1 inch wide(25 mm)on either side of the Pak. <br /> R • Inject water into the slits with the activator syringe or pour in a small amou <br /> newnes \ acup. <br /> Center Pak over • Aluminum foil may be wrapped directly over the joint to prevent the Pak fn <br /> tapered area sticking if it is necessary that the expended Pak be removed from the tren <br /> Fig.7-1.The Chem Cure Pakshould Follow the precautions printed on the Chem Cure Pak wrapper: <br /> produce steam in about30 seconds after <br /> injecting water.Ifno reaction occurs, • Do not get ingredients on skin,in eyes,or on clothing. <br /> discard the Pak and use another one. • Do not breathe dust or vapor. <br /> • Use only outdoors where adequate ventilation is provided. <br /> • Do not take internally. <br /> • Keep out of reach of children. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.