Laserfiche WebLink
Introduction Dualoy 3000/L contained piping systems <br /> Dualoy 3000/1-secondary containment systems are designed to enclose UL and ULC- <br /> listed Ameron primary piping used in product lines,vent lines and vapor recovery lines <br /> from the pump discharge at the product storage tank to the shear valve at the <br /> dispenser.Containment systems employ pipe one size larger than the primary and <br /> specially designed fittings that provide complete enclosure of primary piping.Dualoy <br /> containment systems are designed for close make-up and ease of installation.Contact <br /> Ameron Fiberglass Pipe Division for assistance in designing containment systems. <br /> Dualoy 3000/L non-contained piping systems <br /> Detailed installation instructions for Dualoy 3000/L single-wall piping systems may be <br /> found in Ameron publication Bulletin 7501 (FP104)available from Ameron Fiberglass <br /> Pipe Division or your Ameron distributor. <br /> Fig. 1-1.Atypical three-productservice IIS I� <br /> station layout employing Dualoy 30001L 0O _ <br /> fiberglass pipe forproduct piping and <br /> Stage 1 and Stage//vaporrecovery lines. <br /> Dualoy 3000/L piping is also available for <br /> the complete line of secondary <br /> containment systems. , <br /> Listings and approvals Dualoy 3000/1-is listed in the U.S.with Underwriters Laboratories for nonmetallic <br /> 2underground piping for petroleum products,gasoline-alcohol blends,alcohols and <br /> oxygenated fuels for both primary(File MH9162)and containment(File MH15596) <br /> piping systems.Dualoy 3000/1-pipe and fittings are also listed with Underwriters <br /> Laboratories of Canada for petroleum products and alcohols(File CMH 715),in <br /> U Underwriters ^ Sweden with ABStatensAnlaggningsprovning(CertifikatSA1-1-9846),and in The <br /> m L Laboratories Inc.® U Lv Netherlands with KIWA(Ref.ATA no.2062/1-E).Dualoy 3000/L piping systems <br /> conform to the requirements ofArrete 261 bis(French Ministry of the Environment).In <br /> Great Britain the Dualoy 3000/L system has been tested and accepted by the London <br /> Fire and Civil Defence Authority. <br /> 3 On-site inspection Inspection <br /> and storage Prima ryPpin inspection is eseciall critical on double-wall installations.Shipping <br /> or handling damage is not visible once the primary has been contained.Damaged <br /> pipe can be identified by localized discoloration,crazing and deep scratches or <br /> gouges.Refer to Ameron Bulletin 7501 for guidelines on inspection,handling and <br /> storage.Inspect containment piping and fittings for damage. <br /> Storage <br /> Dualoy 3000/1-pipe incorporates a 5-mil thick,resin-rich reinforced outer coating which <br /> provides outstanding UV resistance.Pipe stored out of doors for extended periods may <br /> assume a chalky appearance.This change in appearance is superficial and does not <br /> affect the pipe's performance.Protect stored pipe from impact damage by stacking on <br /> padded racks.Have ample supplies of nuts,bolts and washers or rivets and adhesive on <br /> hand before starting installation. <br /> 3 <br />