Laserfiche WebLink
9 • <br />SWRCB, January 2002ma <br />RECEIVE 1 e <br />nmt a nntvm a nvMU.F....F.R 1E•{► A <br />Comments — (include information on repairs made prior to testing, and recommenaeajonow-upjarianeu tesu7 <br />*Spill Buckets Tested annually with, Monitoring System Certification. <br />9. SFILL/ V V Lav aLu a va --- <br />Facility is Not Equi2ped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested X <br />Test Method Developed By: ❑ Spill Bucket Manufacturer <br />❑ Other (sped) <br />*See Comments below <br />❑ Industry Standard ❑ Professional Engineer <br />ENVIRONMENTAL HEALTH <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum ❑ jDWkiRTMEN I <br />[I Other (Sped) <br />Test Equipment Used: <br />Spill Box # Spill Box # <br />Equipment Resolution: <br />Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Comments — (include information on repairs made prior to testing, and recommenaeajonow-upjarianeu tesu7 <br />*Spill Buckets Tested annually with, Monitoring System Certification. <br />