Laserfiche WebLink
PROCEDUa9S TO CLOSE & REMOVE TANK(IK WORKPLAN <br /> I. DECONTAMINATION TECHNIQUES <br /> (A) PUMP ANY REMAINING PRODUCT FROM TANK(S) <br /> PUMP PRODUCT INTO VACUUM TRUCK FOR IMMEDIATE LEGAL <br /> DISPOSAL OR INTO APPROVED 55 GALLON DRUMS FOR CON- <br /> TAINMENT, LABELING AND PROPER DISPOSAL. <br /> (B) PROPERLY LABEL ANY ONSITE CONTAINMENT DRUMS . <br /> (C) PROPERLY PREPARE HAZARDOUS WASTE MANIFEST FOR <br /> SHIPMENT AND DISPOSAL. <br /> (E) CONTAIN RINSEATE IN EITHER DRUMS OR IN VACUUM <br /> TRUCK. <br /> (F) LABEL RINSEATE DRUMS. <br /> (G) PROPERLY LABEL RINSEATE DRUMS FOR DISPOSAL. <br /> (H) PRESCRIBED SAFETY PROCEDURES ACCORDING TO <br /> FALCON ENERGY' S HEALTH AND SAFETY PLAN FOR THE <br /> CLOSURE OF IN-GROUND HAZARDOUS WASTE STORAGE <br /> TANKS (ON FILE) AND EMPLOYEE SAFETY POLICY AND <br /> PROCEDURES (ON FILE) SHALL BE STRICTLY ADHERED <br /> TO. <br /> II. REMOVAL <br /> (A) FALCON ENERGY IS A CALIFORNIA DEPARTMENT OF HEALTH <br /> SERVICES LICENSED HAZARDOUS WASTE HAULER, # 2463, <br /> HOLDS A GENERAL ENGINEERING "A" CONTRACTORS LICENCE, <br /> #584524 AND ALSO HAS THE CALIFORNIA HAZARDOUS <br /> SUBSTANCES REMOVAL AND REMEDIAL ACTIONS CERTIFICATION <br /> # 584524 . THE PROJECT MANAGER, JAMES HOBLITZELL, ALSO <br /> IS A CALIFORNIA HAZARDOUS MATERIALS TECHNICIAN. ALL <br /> FALCON ENERGY JOB SITE PERSONNEL HAVE THE 40 HOUR <br /> TRAINING CERTIFICATION. <br />