My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
890
>
2300 - Underground Storage Tank Program
>
PR0231984
>
COMPLIANCE INFO 1988 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 9:03:15 AM
Creation date
11/7/2018 5:36:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988 - 2002
RECORD_ID
PR0231984
PE
2361
FACILITY_ID
FA0001393
FACILITY_NAME
MANTECA LIQUOR & FOOD
STREET_NUMBER
890
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22302007
CURRENT_STATUS
01
SITE_LOCATION
890 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\890\PR0231984\COMPLIANCE INFO 1988 - 2002.PDF
QuestysFileName
COMPLIANCE INFO 1988 - 2002
QuestysRecordDate
2/24/2017 7:28:18 PM
QuestysRecordID
3343089
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> w , ` <br /> b <br /> THE CUSTOMFIF <br /> COSY FIff <br /> Date Technician: ' <br /> Store # Product <br /> Address X 7- STP Brand <br /> j9'if T <br /> RED JACKET LEAK DETECTOR TEST <br /> PRODUCT: Regular, Unleaded, Premium Unleaded, Diesel (Circle One) <br /> NOTE: USE SEPARATE FORM FOR EACH TANK. <br /> 1 ) Running pressure ;_ % 2) Shut-off pressure / <br /> 3) Amount of product released through Bibcock to zero / 2, oz. <br /> 4) With valve open, start STP. List pressure 2 PSI . <br /> 5) Reduce flow to rate of 7 oz. per minute. List pressure at this <br /> flow rate PSI. <br /> 6) Turn STP off. Let pressure drop to zero through leak just created. <br /> List time for gauge to reach zero min. .5' sec. <br /> 7) Turn the STP back on. Keep leak rate at Bibcock. List pressure <br /> 2 PSI. Flow rate at nozzle 3 GPM. <br /> 8) Stop leak with STP still on. Does leak detector reset? X yes <br /> no. If yes, how long to reset? min. � sec. <br /> 9) Turn STP off. List pressure /G PSI. <br /> 10) Turn STP back on. List time to reach pressure rise. min. <br /> 7 sec. <br /> 11 ) List pressure % G PSI . <br /> 12) Open nozzle and list pressure % PSI. <br /> SATISFACTORY LEAK DETECTOR YES NO <br /> LEAK DETECTOR <br /> Model <br /> Leak Sensor <br /> Leak-X Other <br /> THE C1J7r_) r_R COMPANY, P.O. BOX 886, BENICIA, CALIFORNIA 94510, TEL. (707) 745-6691, FAX (707) 746-013' <br />
The URL can be used to link to this page
Your browser does not support the video tag.