Laserfiche WebLink
SWRCB,January 2002 • Page_of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By. ping Manufacturer ❑Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> est Method Used: assure ❑Vacuum ❑Hydrostatic <br /> ❑Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> .. . . . : . tY:_ � ..r is n '..a✓." :.FA....a0..::':.C� . Y ..a4-..) <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of J I <br /> piping-run isolation: �IJ77 too <br /> i— <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> Starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: e S <br /> Final Reading(RF): 3 bZ <br /> Test Duration: 0YK i On <br /> Change in Reading(RF-R,): 49� <br /> ?ass/Fail Threshold or <br /> riteria: <br /> Test Result: ass ❑Fail ❑ Pass ❑Fail 1 ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Cont ments— (include iptfibrinotion on repairs made prior to testing, and recom ended ollow u or failed tests <br /> tQl.w In I � itc., <br />