Laserfiche WebLink
a 0 M <br /> S W RCB, January 2002 Page—of <br /> 9. SPILL/OVERNLL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: L1 Spill Bucket Manufacturer ❑Industry Standard ofessional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: +.-2 r Equipment Resolution: Z! <br /> Spill Box# Spill Box# Spill Boz# spilt Box# <br /> Bucket Diameter: " <br /> Bucket Depth: / <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: ;,30 <br /> Initial Reading(Rc): _& <br /> Test End Time: rev <br /> Final Reading(Rf): C'Jd25 <br /> Test Duration: ,;.t <br /> Change in Reading(RF-Pc): od95' <br /> Pass/Fail Threshold or <br /> Criteria: 1 77777= <br /> II . <br /> ! . 1 e r ;n <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> -t?,If- rr ' Cj e"7i.G$-/ Z:� <br />