Laserfiche WebLink
SWRCB,January 2002 • • Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ?19ofessional Engineer <br /> ❑Other (Specify) <br /> est Method Used: ❑Pressure ❑Vacuum 911ydrostatic <br /> ❑Other (Specify) <br /> Test Equipment Used: ,i.c_ K Equipment Resolution: ,ODS �ctp� <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: q19 t' L o?t yo?` <br /> Sump Depth: t r 99 tt <br /> Sump Material: E G Ffj <br /> Height from Tank Top to Top of t 2 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: t y <br /> Portion of Sump Tested' a rel t'0A <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ) Yes ❑No DNA kYes 0 N 11 NA >tes ❑No DNA ❑Yes 0 N 0 N <br /> product and water)?" <br /> Turbine shutdown response time sindx,-k <br /> Is system programmed for fail-safe �&es 0 N 0 N ;'Yes 0 N 0 N Aures ❑No DNA ❑Yes 0 N 0 N <br /> shutdown?' <br /> Was fail-safe verified to be Yes ❑No ❑NA Yes ❑No ❑NA kYes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational? <br /> Wait time between applying <br /> ressure/vacuum/water and starting <br /> est: S117i !7 /2-7,✓! /`1/ 7 <br /> Test Start Time: <br /> Initial Reading(R,): {�- <br /> Test End Time: 2 <br /> Final Reading(RF): G V oZ s <br /> Test Duration: <br /> Change in Reading(RF-R,): CJS 9-L,5-- <br /> Pass/Fail Threshold or Criteria: 0 0-- yj; 00 jorhiw GoS N"7, <br /> Test Result: >IdPass ❑Fail ❑ Pass ❑Fail ❑ Pass ail ❑ Pass ❑Fail <br /> Was sensor removed for testing? DIYes ❑No DNA Imes ❑No DNA ftes ❑No ❑NA ❑Yes ❑No DNA <br /> Was sensor properly replaced and }o Yes ❑No ❑NA res ❑No ❑NA I Wes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? 7" <br /> Comments- (include information on repairs lmade prior to testing, and recommended follow-up for failed tests) <br /> SUS <br /> U wt E� 47 0 -d j n 1- CU n o4r <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(') is`RIO"or"NA", the entire sump must be tested. (See SWRCB LG-160) <br />