My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
890
>
2300 - Underground Storage Tank Program
>
PR0231984
>
COMPLIANCE INFO 2003 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2022 2:47:22 PM
Creation date
11/7/2018 5:37:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2006
RECORD_ID
PR0231984
PE
2361
FACILITY_ID
FA0001393
FACILITY_NAME
MANTECA LIQUOR & FOOD
STREET_NUMBER
890
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22302007
CURRENT_STATUS
01
SITE_LOCATION
890 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\890\PR0231984\COMPLIANCE INFO 2003 - 2006 .PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2006
QuestysRecordDate
2/25/2017 12:46:53 AM
QuestysRecordID
3343758
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/11/2005 15:01 19163728894 SHIELD, HARPER & CO. PAGE 07 <br /> 1 , l i i E I <br /> The FE Petro STP-MLD leak normal static system pressure,three GPM.This is the indication to the <br /> detector is a three position,pressure- GPH(at 10 psi)is metered through the operator that a loa%is present.If <br /> sensing,piston operated valve SM MLD into the piping system.If a there are no leaks,pressure rapidly <br /> designed to continuously monitor the leak is present that equals or exceeds builds in the system forcing the <br /> piping by indicating any leakage in the this amount,as much product escapes STP-MLD to open to the full-flow <br /> piping between the discharge and the from the system as is metered through position.In a system with no leaks,it <br /> submersible pump and the solenoid the STP-MLD.Under this condition, takes approximately three seconds for <br /> valve in a service station dispenser. pressure cannot build up in the piping a complete test.No further line testing <br /> When the submerged pump is system.When a nozzle is opened,a takes place until the line pressure <br /> turned on atter the system pressure poppet in the STP-MLD moves to a drops significantly below the normal <br /> bas dropped signiftantly below the position that restricts the flow to 2 static system pressure. <br /> n- <br /> I n I <br /> p n , <br /> 1, <br /> _ Up <br /> tiyY <br /> S <br /> 1,The Tripped or Bottom 2.Leak Sensing Position 3.Non-Leak or Full Flow <br /> Position In this position the system pressure Position <br /> When the system is less than 1 psi,the has increased to approximately 12 psi This position allows flail flow.The <br /> piston and poppet are in the and all the flow must travel around poppet will remainin approximately <br /> 'bottom"or"tripped"position.In this the metering pin which limits it to this position as long as the system <br /> position of the poppet,product flows approximately a 3 GPH rate(at 10 psi). pxeastne remains at about the <br /> through the horizontal hole in the pop- If there is a leak in the system which pumping pressure.If the pressure in <br /> pet and around the metering pin at a will allow leakage to exceed this amount, the systemdrops when the pump is <br /> rate of approximately 2 GPM the line pressure will not build beyond turned off,either due to thermal <br /> flow into the delivery line when the this point and the valve will remain in contraction of the product or due to a <br /> submersible pump is running.In the leak sensing position with the main leak,the piston moves downward and <br /> normal operations the piping remains flow blacked.If theca is an attempt to the poppet engages and seals inside <br /> full of fluid and when the submersible dispense while the valve is in this posi- the cage at about 3 psi,or approxi- <br /> pump is turned on,with a flow rate of tion,the line pressure will drop to less mately 10 feet of head,in gasoline. <br /> 2 GPM through.the poppet,pressure than 1 psi,the piston will respond,and Any time the pump is turned on atter <br /> builds rapidly and the poppet moves to the poppet will return to Position 1 the sealon the poppet is inside the <br /> the leak sensing position, where 2 GPM will flow to the dispensers, cage,a line test will be performed. <br /> Leaks smaller than 3 GPIs will be indi- <br /> cated by the STP-MLD taking longer <br /> than three seconds to open completely <br /> because some of the flow leaks out of <br /> the system and the rest builds pressure. CPET _ <br /> If there is no leakage in the system, <br /> the small flow around the metering pin FE Petro,Inc.■4805 Vegas Road <br /> increases the line pressure and in P.O.Box 1.39 a McFarland,WI 53558 <br /> appradmately three seconds the piston (606)8388786 - Fax!(608)838-643,3 <br /> will move the poppet to Position 8. <br />
The URL can be used to link to this page
Your browser does not support the video tag.