Laserfiche WebLink
LG-161-2 <br /> 3 May 15, 2003 <br /> SWRCB UST Program Responsibility:The SWRCB UST Program is responsible for notifying <br /> owners/operators of UST systems within 1,000 feet of a public drinking water well that they are <br /> subject to the requirements of ELD. [Health& Saf. Code, §§ 25292.4, subds. (a) and (b) <br /> 25292.5, subd. (b); Cal.Code Regs.,tit. 23, § 2640, subd. (e)] The SWRCB UST Program is <br /> also responsible for considering requests for reconsideration from those UST owners/operators r <br /> who believe their facility is not subject to ELD. [Cal. Code Regs.,tit. 23, § 2640, subd. e 2 <br /> (See below for additional information on requests for reconsideration.) <br /> Owner/Operator Responsibility: Owners/operators of UST systems that meet the criteria for <br /> ELD must complete the following steps: <br /> • ELD Plan Approval. Have a program of ELD reviewed and approved by the local agency <br /> within six (6) months following notification by the SWRCB UST Program. [Cal.Code <br /> Regs., tit. 23, § 2644.1, subd. (a)(3)] <br /> • ELD Test Implementation. Implement a program of ELD at their facility. <br /> ♦ For UST systems with a single-walled component, ELD testing must be performed <br /> within 18 months following receipt of notification from the SWRCB UST Program. <br /> [Cal. Code Regs.tit. 23, § 2644.1, subd. (a)(3)] <br /> For UST systems without a single-walled component,the one-time ELD test must be <br /> performed by January 1, 2005. [Health& Saf. Code, § 25292.5, subd. (a)] <br /> • ELD Test Notification. Notify the local agency at least 48 hours prior to conducting the <br /> ELD test unless this notification requirement is waived by the local agency. [Id., § 2644.1, <br /> subd. (a)(4)] <br /> • ELD Test Result Submittal. Submit the results of the ELD test-to the SWRCB UST <br /> Program and the local agency within 60 days after the test has been performed. [Id., § <br /> 2644.1, subd. (a)(5)] <br /> The address for submission of the ELD test results to the SWRCB UST Program is: <br /> State Water Resources Control Board <br /> Division of Water Quality <br /> Attention: Elizabeth L. Haven, UST Program Manager <br /> ELD Test Results <br /> P. O.Box 2231 <br /> Sacramento,CA 95812 <br /> Local Agency Responsibility: The local agency is responsible for working with the tank <br /> owner/operator to approve the program of ELD submitted by the owner/operator within six (6) <br /> months following notification by the SWRCB UST Program. The local agency also must <br /> follow-up on the ELD test results and oversee implementation of the recommendations in the <br /> ELD test report. <br /> What should be included in the program of ELD? <br /> The request must include, in writing. <br /> • A modification/amendment to the existing monitoring plan; <br /> • Submittal of standard documentation describing the third-party approved process for <br /> implementation of the ELD requirement(often this is a generic document developed by the <br /> testing company); and <br /> California Environmental Protection Agency <br /> Recycled Paper <br />