Laserfiche WebLink
LG-161-2 -5- May 15,2003 <br /> What is the request for reconsideration process for the ELD requirement? <br /> An owner/operator who believes his/her facility is not subject to the ELD requirements may, in <br /> writing, request reconsideration by the UST Program Manager. A copy of the request must also <br /> be submitted to the local agency. The request must be received by the UST Program Manager <br /> within 60 calendar days from the date the SWRCB mailed the notification to the owner/operator. <br /> The UST Program Manager must make a decision on the request and notify the applicable local <br /> agency of the decision within 90 calendar days of receipt of the request. [Cal. Code Regs.,tit. <br /> 23, §2640,subd. (e)(2)and(3)] A "Request for Reconsideration Form" is included in the ELD <br /> notification packet sent to owners/operators of subject UST systems and is available on the <br /> SWRCB UST Program webpage at: http://www.swrcb.ca.gov/ust. <br /> • What must be included in the request for reconsideration? The request must include, <br /> in writing: <br /> e The name and address of the subject facility; <br /> ♦ The name and address of the owner/operator submitting the request; and <br /> ♦ The reason(s)why the requester believes the SWRCB's notification was in error. If <br /> the request is based on evidence that the UST system in question is greater than 1,000 <br /> feet from a public drinking water well, the request must include a demonstration that <br /> the center of the wellhead is more than 1,000 feet from) (e] closest component of the <br /> UST system. [Cal. Code Regs.,tit. 23, § 2640, subd. e 3) <br /> • Owners/Operators should submit their request(s) for reconsideration to both their <br /> local agency at the appropriate address and to the SWRCB UST Program at: <br /> State Water Resources Control Board <br /> Division of Water Quality <br /> Attention: Elizabeth L. Haven, UST Program Manager <br /> ELD Request for Reconsideration <br /> P. O.Box 2231 <br /> Sacramento,CA 95812 <br /> • What if the request for reconsideration is inadequate to make a decision? Upon <br /> receipt of a request for reconsideration that does not include all of the required <br /> information,the UST Program Manager will advise the requester of the manner in which <br /> the request is incomplete and allow a reasonable time within which an amended request <br /> may be subrfitted. If the UST Program Manager does not receive an adequate amended <br /> petition within the time allowed,the request for reconsideration may be denied. <br /> What does it mean if the ELD test results indicate that the UST s stem has "failed"? <br /> Note: The following information is based upon the Enhanced Tracer Tight®test performed by <br /> Praxair Services, Inc. (formerly known as Tracer Research Corporation). As other test methods <br /> become available,we will prepare additional information if appropriate. <br /> A "fail"test result indicates that a substance that is not a component of the fuel formulation <br /> stored in that UST system (referred to as a"tracer" by Praxair Services, Inc.) has escaped from <br /> the UST system. Based upon the distribution and concentration of tracer detected in the soil gas <br /> samples collected around the UST system, Praxair Services, Inc. is able to infer the location, <br /> relative size, and type of release (liquid versus vapor). <br /> California Environmental Protection Agency <br /> Recycled Paper <br />