Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(ADC)MONITORING (Checkall <br /> that apply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY90.54-7 <br /> ❑ 3.ELECTRONIC STAND-ALONE 4 <br /> 4.NO DISPENSERS ❑ 99.OTHER(Specify) 4971-54b. <br /> LEAK MONITOR MANUFACTURER: V 1Zp 490-55. MODEL#: 49055. <br /> LEAK SENSOR MANUFACTURER: y 'Q 490-5T MODEL#(S): 2-0 n 490-Se. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. 9 a.YES ❑ b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ;R a.YES ❑ b.NO 090.60 <br /> FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 19)a.YES ❑ b.NO 49061. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. tg a.YES ❑ b.NO 49063. <br /> UDC CONSTRUCTION IS: `1 L SINGLE WALL ❑ 2.DOUBLE WALL 49-763. <br /> IF DOUBLE WALL: 49064s <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490646, <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ L ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49065_ <br /> LEAKDETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.Iv CCR;Ss44.r1 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490'66 <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49042 <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 49 , <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING ; <br /> E Personnel with UST monitoring responsibilities we familiar with all of the following documents relevant to theirjob duties: 49-76% <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 4906 b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49069c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4904%. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4906% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49069[. <br /> STATISTICAL INVENTORY RECONCILIATION' <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49°'698 <br /> ❑ OTHER(Specify): 490496. <br /> 490.6%. <br /> ® This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This(mining will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> D The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X.-COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific moTtoring rocedures are attached to this plan. 490-71. <br /> 2 Cr ✓ T Q;l S <br /> XI. PERSONNEL RESPONABILITIES <br /> The UST Owner/Operator is responsible for ensuring that. 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release are investigated;and 3.)all monitoring records are maintained properly. _ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: /1Ie� 49072 TITLE: (A 490-73. <br /> NAME: ff49074. TITLE: 49 75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DAATTE: 49077. <br /> MPRF3E G:0 1,Trak 0.71,4,;;;2.Fe i netl0 Sr 3.Amhon¢a R r.entmve down. 490.76 `'- <br /> APPLICANT NAME(print): 490-78. APPLICANT TITLE- 490'99 <br /> t r -S f t�,clO F/ Noll <br /> UPCF UST-D(12/2007)-3/4 www.unidocs.org Effective 01/19/08 <br />