Laserfiche WebLink
It UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN- (Page 1 of 2 <br /> TYPE OF ACTION SO I.NEW PLAN <br /> ❑ 2.CHANGE OF INFORMATION 4'"W <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490.2. <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or��DBA) 3. <br /> BUSINESS SITE ADDRESS 103. BUSINESS SITE CITY IN <br /> o N S - c C -TCS <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> bytheeguipment manufacturers instructionnually_whichever is more frequent,Such work mustbeperformed by qualified personnel.I23 eca§2632,263x,2638.2mil <br /> MONITORING EQUIPMENT IS SERVICED III. 49U3a <br /> OI.ANNUALLY 99.OTHER(Specify): 490-3bNITORING <br /> LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR§2632,26341 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) nCl�k all <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 49x5. <br /> WITH AUDIBLE AND VISUAL ALARMS.123 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ®a.DRY <br /> 1 ❑, b.LIQUID FILLED El c.PRESSURIZED El d.UNDER VACUUM 4"'s <br /> PANEL MANUFACTURER: t/o4z clyW Ra5sT 'T LCft 'i&S b 490-3 MODEL#: L S -AS-b 490-8. <br /> LEAK SENSOR MANUFACTURER: Llee.CAP ✓ f4j" "'FFj=f 4%4 MODEL#(S): 4PL0 49x10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).123 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 090'12 MODEL#: 490-11 <br /> IN-TANK PROBE MANUFACTURER: 490.14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 4W-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-1T <br /> PROGRAMMED TESTS: [I a.0.1 g.p.h. ❑ b.0.2&p.h. ❑ c.OTHER(Specify): 490-1e. <br /> 490.19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123 CCR§2646.11 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 ccR§26451 TESTING PERIOD ❑ a.36 HOURS ❑ b.60 HOURS 49x21. <br /> 490-22. <br /> ❑ 5.TANK INTEGRITY TESTING PER 123 CCRJ1643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS 1 090'24 <br /> ❑ 99.OTHERi -4A <br /> (Specify): 617-16. <br /> 4W-17 <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) nnhrak i l <br /> 1.CONTINUOUS MONITORING OF PIPEIPIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 4%-28. <br /> 5U36l SECONDARY CONTAINMENT IS: r a.DRYO-❑ b.LIQUID FILLED [__1c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER: VP e4-e V QUI- 490.30. MODEL#: TLS 3 S-0 490.3L <br /> LEAK SENSOR MANUFACTURER: u 9 490.11 MODEL#(S): 20 R 490.33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑ a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-35. <br /> PL 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS <br /> !OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETIE�C.TED.[23CeiR§z63'61 I .A FX Z9V0-3a <br /> MLLD MANUFACTURER(S): C, �JQ'1 ybr- , Q�ol L. (l{�" 490-33 MODEL#(S): S T r- M L� <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 ccR§2636] 490.39. <br /> ELLD MANUFACTURER(S): 490'40 MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1&p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49044. <br /> ❑ 4.PIPE INTEGRITY TESTING. ago-Os. <br /> TEST FREQUENCY: [I a.ANNUALLY [Ib.EVERY 3 YEARS ❑ c.OTHER(Specify) 449'46. <br /> ❑ 5.VISUAL PIPE MONITORING. 490.48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49049. <br /> _ 'Allowed fa moNton of lmried em c aetor fuel i in oN HSC 25231.5 3 _ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.123 CCR§2636(aN3)1 a90-So <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 49x51. <br /> ❑ 99.OTHER(Speci ) 49x52 <br /> %53. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org Effective 01/17/08 <br />