Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 4 of s) <br /> XIII. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A ❑ I B I C D ❑ <br /> A I B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> Vapor Recovery Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Interstitial Communication Verification Method Used: <br /> XIV. COMMENTS <br /> Provide any additional comments here. <br /> Single Wall Vapor Recovery Piping at this UST Facility. <br /> XV. TURBINE/PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> U n known/Fi berg lass Contruction A ❑x B ❑x I C ❑x I D ❑ <br /> A ❑ B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑Industry Code or Engineering Standard(Specify): <br /> p Engineered Method(Specify): Caldwell Systems/Level Change Indicator <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> Turbine/Product Piping Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indicator 7/5/2020 <br /> XVI. COMMENTS <br /> Provide any additional comments here. <br /> ID=Identification <br />