My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:22:44 PM
Creation date
11/7/2018 5:51:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\IAError\M\MAIN\4075\PR0231667\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue,Stockton,California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.siaov.orD/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> JAMAR SERVICE 4075 E MAIN ST STOCKTON May 23, 2016 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 209 CCR 2715(f)Designated operator employee training not performed or log not kept. <br /> The designated operator employee training was not performed.The training is being performed by another party. No <br /> dates of hire of employees have been indicated.The designated operator shall train facility employees for which he or <br /> she is responsible in the proper operation and maintenance of the UST system once every 12 months. The training <br /> shall include,but is not limited to: <br /> 1.Operation of the UST system in a manner consistent with the facility's best management practices <br /> 2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br /> 3.Employee's role with regard to spills and overfills as specified in the facility's response plan <br /> 4. Name of the contact person(s)for emergencies and monitoring equipment alarms <br /> Ensure that employees have been trained by the designated operator,maintain the list on site,and submit a copy of <br /> the training records to the EHD. <br /> This is a minor violation. <br /> 306 CCR 2630(d)Monitoring equipment is not installed or maintained to detect a leak at the earliest opportunity. <br /> The 206 sensor in the 87 product submersible turbine pump was tilted greater than 45 degrees and was not located to <br /> detect a leak at the earliest opportunity. Monitoring equipment shall be maintained to be able to detect a leak at the <br /> earliest possible opportunity. The sensor was relocated to the lowest point of the sump by the service technician. <br /> Ensure that all monitoring equipment is maintained to detect a leak at the earliest opportunity. <br /> This was corrected on site. <br /> This is a repeat violation,Class II. <br /> 314 CCR 2631(a)Primary containment not tight(pre-Jul 2003). <br /> Dispensers 3-4,5-6 and 7-8 had leaks at the shear valve, indicating a leak in the primary piping. All primary <br /> containment for the UST system must be tight. Immediately have a properly licensed,trained,and certified contractor <br /> repair or replace the failed component under permit and inspection of the EHD. <br /> This is a minor violation. <br /> 319 HSC 25291(e)Water in secondary containment not removed,analyzed,and properly disposed of(pre-Jul 2003). <br /> Approximately two cups of liquid were observed in the 87 product submersible turbine pump sump. If water could <br /> enter into the secondary containment by precipitation or infiltration, it must be removed and disposed of properly. The <br /> service technician removed two cups of liquid from the 87 product submersible turbine pump sump. Ensure that all <br /> sumps and annular spaces are maintained free of liquid. <br /> This was corrected on site. <br /> This is a repeat violation,Class II. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> Page a of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.