My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:22:44 PM
Creation date
11/7/2018 5:51:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\IAError\M\MAIN\4075\PR0231667\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 8. FILL RISER CONTAINMENT SUMP TESTIN( <br /> Facility is Not Equieped With Fill Riser Containment Sums X <br /> Fill Riser Containment Sumps are Present, but were Not Tested L <br /> Test Method Developed By: Sump Manufacturer -Industry Standard . Professional Engineer <br /> Other(Specify) <br /> Test Method Used: =Pressure ❑Vacuum Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Fill Sump# Fill Surne# Fill Sump# Fill Sump# <br /> rHeight <br /> ameter: <br /> Depth: <br /> om Tank Top to Top of <br /> i in Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material <br /> Wait time between applying <br /> water and startin test: <br /> Test Start Time: I 2Q17 <br /> Initial Reading Ri): <br /> Test End Time: <br /> Final Reading(RF): ENVIRONM ENTA HEALTH <br /> Test Duration: <br /> Chane in Reading RF-Ri : <br /> Pass/Fail Threshold or Criteria: A <br /> Test Result: <br /> Is there a sensor in the sump? <br /> Does the sensor alarm when <br /> either product or water is <br /> detected? <br /> Was sensor removed for testing? <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.