My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
616
>
2300 - Underground Storage Tank Program
>
PR0502539
>
REMOVAL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 3:50:37 PM
Creation date
11/7/2018 5:54:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1990
RECORD_ID
PR0502539
PE
2381
FACILITY_ID
FA0009080
FACILITY_NAME
MANTECA EQUIPMENT RENTAL
STREET_NUMBER
616
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337-5728
APN
22104039
CURRENT_STATUS
02
SITE_LOCATION
616 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\M\MAIN\616\PR0502539\1990 REMOVAL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page <br /> 4"0 Personnel : <br /> 4" i Project Manager <br /> -Manages field operations. <br /> -Prepares and organizes the site background review, the <br /> Work Plan, and the field crew. <br /> ~Ensures the Work Plan is completed and on schedule, <br /> -Briefs the field teams on their specific assignments. <br /> -Participates in the preparation of the Site Safety <br /> Plan. <br /> -Periodically inspects site protective clothing and <br /> equipment . <br /> -Conducts periodic inspections to determine if the Site <br /> Safety Plan is being followed " <br /> -Serves as a liaison with public officials" <br /> ~Documents field activities and sample collection. <br /> 4,E Site Safety Officer <br /> -executes the Work Plan and schedule" <br /> -implements and enforces the GGF^ <br /> -Assures that all on-site personnel have received a copy <br /> of the SSP, have read it and understand it . <br /> -Conducts frequent inspections of site conditions, <br /> facilities/ equipmentv and activities to determine if <br /> the SSP is adequate and being followed . <br /> -Conducts. daily :te,ilgate" meetings to explain the plan <br /> of work for the day, mention potential hazards of the <br /> site. <br /> -Ensures that protective clothing and equipment are <br /> properly stored and maintained, <br /> -Knows emergency procedures, excavation routes, and <br /> notifies local emergency services when necessary. <br /> -Notifies the Health and Safety Manager of all accidents <br /> and injuries that occur on site, <br /> 4,3 On-Site Personnel : <br /> -Construction personnel are to work in a safe and <br /> organized manner . <br /> -Are required to document their full understanding of <br /> the SSP before starting work by signing that they have <br /> read the 55P and understand it , <br /> -Safely completes the on-site tasks required to fulfill <br /> the Work Plan. <br /> -Complies with the G5P" <br />
The URL can be used to link to this page
Your browser does not support the video tag.