My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:23:53 PM
Creation date
11/7/2018 6:08:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI INC
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MARCH\1916\PR0527728\BILLLING 2009 - 2015.PDF
QuestysFileName
BILLLING 2009 - 2015
QuestysRecordDate
9/28/2017 8:23:44 PM
QuestysRecordID
3652727
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�r UNDERGROUND STORAGE TANK ImOP <br /> RESPONSE PLAN—PAGE 1 (one four,per Iacilih) <br /> Rol <br /> TYPE OF ACTON 1.NEW PLAN [12.CHANGE OF DWORMATION <br /> I. FACILITY INFORMATION <br /> FACILM ID- 09em7-Use Onh) — — <br /> BUSINESS NAME(Sam:asFACR.R'YKWE) <br /> BUSMSS SITFADDRESS l/•'11��Y lm BUSINESS SITE CITY <br /> 19 C (e-aj� 9szc=r�� <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthor¢ad releases from UST s}alems and supplements the emergency response plans and procedures in the facilih's Hazardoua hlateruLs <br /> Business Plan(HNMP). <br /> Y U sate to do so,tacilih-petsomel will lake immediate measures to control or stop any release(c.g-activate pump shut-oB:cte.)and.if nccessa .safely temoye <br /> remaining hazardous material from the UST system. <br /> Y stn release to sccondan containment will he pumped or otherwise n,.AA within a time consistent with the abilihof the secondary containment system to <br /> onlain the hazardous material-but not greater than 10 calendar days.m sooner if required by the local agency. Reem Bred hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ absorbent material will be used io contain and clean up manageable spills of hazardous matcnals. .absorbent material which has become,loo saturated to be <br /> effccti,c or which is no Ringer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 fords that <br /> it is mmahazardons. Used absorbent material reusable or wash,will be stored in a properh labeled and sealed container. Waste material shall be disposed of <br /> appapnately. <br /> Y Facilih personnel will determine whether an)' water rcmoyzd from seeondan containment systems, or from clean-up acti%th, has been in contact with ant <br /> hazardous material.If the wales is contamwtc&it will be managed as hazardous waste unless a hazardous,waste detemtina6on in accordance with 22 CCR <br /> §026211 find that 0 i urn-hazardous If the water has a petroleum sheen(is_ .mbo w Cohrs).it is contaminated. a thick floating petroleum layer may not <br /> necessarily display rainbow cobra. Wates(haradous or non-hazadous)from sumps,spill containers,etc.will not be disposed b slam water systems. <br /> Y We will review secondary contammesl systans for possible deleriuntion if any of the following conditions occas: <br /> L Hazardous material in contact with seemsdary containment is not compatible with the material used for secwdary containment <br /> 2 Secondary containment is prone b damage from any equipment used to remove or clean up hazardous material collected in secondary containment <br /> Hazardous nMcrml. odrer than the productwaste stored or the priman corusmanent s1'stent, is placed inside seamdary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compattile with secondary containment <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC hL]SWENANC'E: Spill control and chin-asp equipment kept pemmncuth.on-site is listed in the facilitv's Hazardous hlaterials Business Has. This <br /> egorpmevl is ospected al least monthly,and after each arae,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> E UIPhIENI'NOT PERTLINENTLY ON-ME,BITE AVAILABLE FOR USE IF NEEDED: (Corerafere only i Ircable) <br /> EQUIPMENT LOCATION AVAU AMITY <br /> R10. R20. R30 <br /> R11 R'.1. R31 <br /> R12. A-1 R3+. <br /> R13. 121. "1. <br /> RIs. RZt R31 <br /> RIS RTS R3< <br /> W. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Ras TITLE RW <br /> NAME Rll TITLE R 1 <br /> NAME Ra' TITLE RS' <br /> Nll11E Rat TITLE Rin <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED 1�RFLE.AM.STEPS TO VERIFY THE RELEASE V(TLL BE NUDE AS FOLLOWS: <br /> Rin. ADDITIONAL SYSTEM TESTING OR DATAC OLIECTION T"`. INSP=ON BY QUALIFIED PERSONS Pd3. RECALIBRATIONOFEQUPMENT Rha <br /> [J99. OTHER(Specdy): R61 <br /> UN-022B-1!d www.unidomorg Rev.04102M <br />
The URL can be used to link to this page
Your browser does not support the video tag.