My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1987 INSTALL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
INSTALL 1987 INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:55 PM
Creation date
11/7/2018 6:28:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987 INSTALL
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\2467\PR0231818\1987 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTION lA <br />ARTICLE 3, SECTION 2631 <br />MOTOR VEHICLE OR NONMOTOR VEHICLE FUEL TANK <br />CONSTRUCTION STANDARDS <br />1 <br />2 <br />3 <br />Secondard containment provided. <br />Primary containers shall be product tight. <br />Secondary containers <br />A. Thickness, density, composition, and product compatibility. <br />B. Sized to contain unauthorized releases for sufficient time to <br />detection and removal. <br />allow <br />4. Secondary container volumetric requirements <br />A, Single primary container = 100%. <br />B. Multiple primary containers = 150% of largest primary container or <br />10% above aggregate. <br />1. Document interproduct compatibility <br />5. Secondary containers open to rainfall. <br />A. Volumetric requirement = 24 hours of 25 year storm in addition to <br />primary container volumes. <br />A <br />7 <br />Pore space of granular material used as backfill for the primary containers. <br />A. Refer to Section 2631(g). <br />Secondard container equipped with a collection system. <br />A. Designed to: <br />1. Accumulate <br />2. Temporarily store <br />3. Permit removal of: <br />a. Precipitation <br />b. Subsurface infiltration <br />c. Released hazardous substances <br />from primary container(s). <br />8. Floor of Secondary container <br />A. Constructed on firm base <br />B. Sloped to collection sump (1/8" per foot). <br />1. One or more access casings installed in sump <br />a. Sized to allow removal of collected liquid <br />b. Extend to ground surface <br />c. Perforated in sump region. <br />d. Covered with a locked waterproof cap or within a secured facility <br />e. Thick enough to withstand anticipated stresses <br />f. Construction materials: <br />1) Are not weakened by stored product <br />2) Will not donate, capture, or mask constituents to be analyzed. <br />9. Membrane liner specifications: <br />A. Refer and comply with Article 3, Section 2631 j, k, 1, and m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.